Similar Projects
Renovation of School Based Health Care Clinic
Renovation - 1,185 SF
Post-Bid
Petersburg, VA

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Results
$55,000,000 est. value
Alexandria, VA 22309

Stonewall Jackson High School Concessions and Toilets
Results
Manassas, VA

Construction of a New Operations Center for Suffolk Public Schools
New Construction
Construction
$17,000,000 est. value
Suffolk, VA

Construction of the Westmoreland High School Replacement (Washington and Lee)
Construction
$44,500,000 est. value
Montross, VA 22520

Cedar Lee Middle School Expansion and Renovation Project
Renovation, Addition - 105,062 SF
Post-Bid
Bealeton, VA 22712

Centreville High School Room Modification 2
Renovation
Results
Clifton, VA 20124

Bradford Hall Renovations
Renovation - 3,166 SF
Construction
$1,359,000 est. value
Staunton, VA

Justice High School Science Lab
Results
Falls Church, VA 22044

Hughes Middle School Renovation
Renovation - 189,000 SF
Construction
$41,388,000 est. value
Reston, VA 20191

Portable Classroom Services
Results
Virginia Beach, VA 23456

Staunton High School Additions And Renovations
New Construction, Renovation - 180,000 SF
Construction
$46,000,000 est. value
Staunton, VA 24401

Disaster Recovery Services
Results

FTD Phase 2 Project - Elevated Gymnasium
Construction
$2,750,000 est. value
Alexandria, VA 22314

Reported 06/21/2021 10:13 AM
Project Title

Design-Build Project - William Byrd High School Renovation

Physical Address View project details and contacts
City, State (County) Vinton, VA 24179   (Roanoke County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced third quarter 2021
Bids Due View project details and contacts
Estimated Value $15,000,000 to $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is to modernize a majority of the school, with greater than 100,000 SF of renovations on both the first and second floors, and ~13,500 SF of new multi-story construction on the current William S Byrd HS facility.

Details

,, 113,500 SF - 1 Middle/Senior High School, 2 Stories Above Grade, Approximately 100,000 SF Renovation, 1 Middle/Senior High School, Approximately 13,500 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents