Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Manson Ditch Drainage Improvements
Infrastructure
Bidding
Gretna, LA

Hurricane Damage Repairs Grant Walker 4-H Educational Center
Infrastructure
Bidding
Pollock, LA 71467

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Biloxi Marsh Living Shoreline Project
Infrastructure
Post-Bid
$50,500,000 est. value
LA

LA 1 - Port Allen Canal Br Repl (PH1)(HBi)
Infrastructure
Results
$50,000,000 to $70,000,000 est. value
Shreveport, LA 71115

Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

Floodwall Improvements for Section D-South Project at Crawfish Farm, Phase II
Infrastructure
Bidding
Galliano, LA

Walter O. Bigby Carriageway Drainage Pump Station
Infrastructure
Post-Bid
$3,900,000 est. value
Bossier City, LA

LA 114 - X Drain Replace West of Hessmer
Infrastructure
Results
$250,000 to $500,000 est. value
Hessmer, LA 71341

Midway Drive Drainage Improvements (Jefferson Hwy. To Charlotte Dr.)
Infrastructure, Alteration
Bidding
Gretna, LA

Landbridge Shoreline Stabilization and Marsh Creation Project
Infrastructure
Post-Bid
$13,231,110 est. value
New Orleans, LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

St. Louis Area Drainage Rehabilitation
Infrastructure
Bidding
Lake Charles, LA

Last Updated 10/23/2021 02:43 AM
Project Title

Oak Park Lateral Drainage Improvements

Physical Address View project details and contacts
City, State (County) Lake Charles, LA   (Calcasieu County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of improvements to subsurface storm drainage system along lateral streets adjoining Oak Park Boulevard. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as new storm drain inlets and subsurface piping to improve drainage flow and maintain the integrity of the property through which it serves. Project scope includes locations along Oak Park Boulevard and neighboring streets between 1st Avenue and 4th Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents