Similar Projects
Oyster Bay Townhomes
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Gulf Shores, AL 36542

Belforest Water System Raw Water Main K-6 Well #5 to Larry Street Road WTF #4
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

Construction of Sewer Collection System Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Fairhope, AL 36532

Fairhope Docks Marina Electrical System
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Fairhope, AL 36532

Spirit Park Field 1 Infield Improvements
Renovation
Post-Bid
Spanish Fort, AL 36527

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

George C. Meyer/Johnnie Sims Tennis Complex Restoration
Results
Gulf Shores, AL 36542

Hammer Cage Repairs
Results
Gulf Shores, AL 36542

Intersection Improvements (Traffic Signals and Lighting) on SR-3 (US-31) at Bedrock Boulevard/ Flora Drive
Infrastructure
Bidding
$341,288 CJ est. value
Spanish Fort, AL 36527

Assembly of Six Portable Bleachers at Foley Sports Tourism Event Center
New Construction
Post-Bid
Foley, AL 36535

Gulf Place Playground Shade Sail Installation
Results
Gulf Shores, AL 36542

Street, Grounds, and Parks
New Construction, Infrastructure
Bidding
Daphne, AL

Bon Secour Dredge Site Repairs
Infrastructure
Post-Bid
Bay Minette, AL

Foley Downtown Improvements 2021
Results
Foley, AL 36535

Capacity Improvements to Waterway East Boulevard
Infrastructure
Bidding
$4,000,000 CJ est. value
Gulf Shores, AL 36542

Last Updated 08/03/2022 01:02 PM
Project Title

Lott Park Pickleball Expansion

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $410,775 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

One hundred twenty (120) calendar days are allowed for the construction of the project. Work will include construction of new pickleball courts, modification of existing courts, and installation of owner provided lighting. All Bids must be on blank forms provided in the Specifications and submitted in its entirety. A cashier's check drawn on an Alabama bank or a Bidder's bond, payable to City of Daphne, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000), shall be filed with the Bid. The Bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the City in an amount not less than the contract price will be required at the signing of the Agreement. A labor and materials bond in the form and terms approved by the City in an amount not less than the Contract Price insuring payment for all labor and materials shall also be required at the signing of the Agreement. In addition, the Contractor must furnish to the City at the time of the signing of the Agreement a certificate of insurance coverage as provided in the Contract Documents. The City reservesthe right to reject any and/or all Bids and to waive informalities and to furnish any item of material or work to change the amount of the Contract Price. Liquidated damages for non-completion of the Work within the Contract Times will be assessed in accordance with the terms of the Contract In evaluating Bidders, the City will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as may be provided in the Supplementary Conditions. The City may conduct such investigations as the City deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work in accordance with the Contract Documents. The City may disqualify Bidders that have had prior demands placed on a bid bond, payment bond, or performance bond within the last five (5) years prior to the date of this Bid submission. The City may disqualify Bidders that have prior or existing litigation arising from allegations regarding the quality of work performed on any contract within the last five (5) years prior to the date of this Bid submission. No Bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of Bids without the consent of the City Council of City of Daphne, Alabama. Work will include construction of new pickleball courts, modification of existing courts, and installation of owner provided lighting.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents