Similar Projects
Inspection of and Recommendation of Rehabilitation/Upgrades to HVAC Units and Installation of Air Purification Systems
Alteration
Bidding
North Little Rock, AR

Chiller Replacement
Term Contract
Bidding
$250,000 to $500,000 est. value
Fort Smith, AR

HVAC Renovations of the Performing Arts Center
Alteration
Sub-Bidding
West Memphis, AR 72301

Purchase and Installation of 1-2 Ton Mini Split Heat and Air Unit
Post-Bid
Quitman, AR

Purchase and Installation of 12-5 Ton Heat and Air Units
Post-Bid
Quitman, AR

HVAC and WH Upgrades
Results
Jacksonville, AR

Intake Improvements HVAC, Electrical and Mechanical
Alteration
Results
Less than $500,000 est. value
Pearson, Quitman, AR 72131

HVAC Program
Alteration
Bidding
AR

Contractor/Construction Manager for an Energy Savings Contract
Post-Bid
Trumann, AR

On-Call Hvac Services
Term Contract
Bidding
Fayetteville, AR

HVAC units Districtwide
Post-Bid
Donaldson, AR

On-Call HVAC Services
Term Contract, Infrastructure
Bidding
Fayetteville, AR

Replacement of Boiler and Water Heater at the MAC Building
Alteration
Post-Bid
Little Rock, AR 72201

Geothermal Repairs and Upgrading
Alteration
Post-Bid
Hot Springs, AR

HVAC and Ionization Upgrade
Alteration
Post-Bid
Mountain Pine, AR

Reported 07/08/2021 12:00 AM
Project Title

Replace Radiant Heaters - B140

Physical Address View project details and contacts
City, State (County) Jacksonville, AR 72076   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Replace Radiant Heaters of B140. All components of the existing heaters shall be removed including the electrical, suspension hanging equipment, mounting hardware, all heater components, and exhaust pipes. Each of the 4 heating arms are 50 feet long. The replacement heaters shall meet the same specifications as the existing heaters while also correcting the chronic radiant heat tube expansion and separation failures. Investigating into the root cause of the radiant heat tube separation will be very important for the success of this project. Additionally, new surface mounted conduit, electrical wiring, and ventilation system shall be installed. The end result of this project will result in the replacement and correction of the existing radiant heaters in building 140.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents