Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Dingens Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$15,000,000 CJ est. value
Buffalo, NY 14206

Walden Avenue Grocery Store
Addition, Renovation, Infrastructure
Design
$1,500,000 CJ est. value
Buffalo, NY 14211

Rogers Road Apartments
New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Hamburg, NY 14075

West Parking Garage
New Construction, Infrastructure - 28,830 SF
Post-Bid
$30,000,000 CJ est. value
Buffalo, NY 14203

Stair/Plaza Reconstruction and Related Work - Riverside High School
Infrastructure
Post-Bid
Buffalo, NY 14207

Northtown Center Parking Lot Expansion
Infrastructure
Results
Williamsville, NY

Business District Parking Lot Improvements
Infrastructure
Results
$325,000 est. value
Gowanda, NY 14070

Apartments at the Lyceum
New Construction, Infrastructure
Construction
$23,000,000 CJ est. value
Buffalo, NY 14212

Flexlume Sign Company Headquarters
New Construction, Infrastructure - 20,000 SF
Construction
$2,100,000 CJ est. value
Lackawanna, NY 14218

Covenant Gardens
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Hamburg, NY 14075

RFP - North Aud Block Redevelopment
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Buffalo, NY 14202

Grain Mill Mixed-Use Development - Phase 2
Demolition, New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Buffalo, NY 14203

Elmwood Crossing Phase 2
New Construction, Renovation, Infrastructure - 10,123 SF
Design
$10,000,000 CJ est. value
Buffalo, NY 14222

Stair/Plaza Reconstruction and Related Work - Bennett High School
Infrastructure
Post-Bid
Buffalo, NY 14214

Last Updated 01/14/2023 01:01 PM
Project Title

Freedom Wall Walk

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14209   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Freedom Wall Walk project base bid work includes exterior sidewalk and curb replacement, and hardscape improvements in front of the Freedom Wall, as well as constructing overhead lighting over each wall panel. Bids will be accepted either in offline (paper) or online (electronic) versions. Offline bids should be submitted in an opaque sealed envelope to the Engineering Branch on the 7th floor of the MTC. The lower left-hand corner should be marked as follows: BID NO. E-578. Online bids should be submitted in accordance with the process outlined on the NFTA's Engineering Branch. The Contract Documents may be examined in the 7th Floor Conference Room, 181 Ellicott Street, Buffalo, New York 14203 or on the NFTA's Engineering Branch website at www.nftaengineering.com. Online registration is required to become a Plan Holder and obtain Contract Documents. The Contract Documents may be picked up or sent via courier billed to the requester. The NFTA reserves the right to waive irregularities, to reject any or all bids and to extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 at portal, or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA's Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 10% of the Work with its own forces. The time of completion for the project is 81 calendar days after receipt of the Notice to Proceed. Liquidated damages in the amount of $720 per calendar day will be assessed against the Contractor for its failure to complete the project within the time specified.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents