Similar Projects
Last Updated | 08/18/2020 08:52 AM |
Project Title | Transmission Under-Build (GP&L Distribution) |
Physical Address | View project details and contacts |
City, State (County) | Garland, TX 75040 (Dallas County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: SR 494812 - AP-LK Replace 30 – 45’ wood poles with 45’ steel poles Replace 7 – 50’ wood poles with 50’ steel poles Replace 12 – 45’ wood poles Re-conductor approximately 1500’ of #477 ACSR, 4/0 ACSR three phase primary Replace 1- 30’ wood pole with overhead guy Transfer 4 - #1000 kcm three phase feeder risers Transfer 5 - #2/0 single phase risers All steel poles will be install with a concrete collar. Specification will be provided. SR 507045 – Re-conductor Section of JU-3 Re-conductor approx. 7506’ of 3-#477 ACSR primary and 2489’ of 1-#4/0 ACSR neutral Replace 900 amp air switch One 40’ wood pole SR 501940 – Re-conductor Section of CD-1/CR-6 Re-conductor approx. 17,626 of 3-#477 ACSR primary and 5862’ of 1-#4/0 neutral Replace 9-45’ wood poles Install 900 amp air switch SR 507054 – CR-3: Add Partial Double Circuit & Transfer Load Install approx. 6782’ of 3-477 ACSR primary (above existing circuit) Replace wood poles with 14-50’ and 2-55’ steel poles Install 2 vertical 900 amp air switches Transfer pole risers SR 507067 – Re-conductor Part of MQ-3 Re-conductor approx. 6576’ of 3-477 ACSR primary and 2192’ of #4/0 ACSR neutral Replace 4-45’wood poles with steel. Install 900 amp air switch. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |