Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Durand - Mondovi Construction / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Alma, WI 54610

Rice Lakes Aquatics & Recreation Center
New Construction, Infrastructure
Design
$11,000,000 to $13,000,000 est. value
Rice Lake, WI 54868

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Perkins Park Ballfield Renovation
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54303

Nw Reg, STH 29 Brdg Deck Sealing; Bridge Deck Sealing (Var), STH 029
Infrastructure
Bidding
$500,000 CJ est. value
Chippewa Falls, WI 54729

MAC Dental Center / Ledgeview
New Construction, Infrastructure - 7,078 SF
Sub-Bidding
$2,500,000 CJ est. value
De Pere, WI 54115

Lock and Dam 4 Lower Guide Wall End Cell Project
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Alma, WI 54610

Burnett County Public Safety Facility Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$32,600,000 CJ est. value
Siren, WI 54872

Odden Road and Odden Lane Improvements
Infrastructure
Results
Barronett, WI

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Last Updated 01/12/2023 12:09 PM
Project Title

Darlington Community School District FEMA Addition Bid Package 1 - General Construction

Physical Address View project details and contacts
City, State (County) Darlington, WI 53530   (Lafayette County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $178,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Project consists of creating a FEMA Safe Room (Gymnasium) attached to an existing elementary-middle school. The Work of the project is divided into two separate bid packages: Bid Package #1 includes all Work of the project with the exception of providing HVAC Controls. Components included in bid package #1 include cast-in-place concrete, precast concrete, block and brick masonry, cold formed metal framing, structural steel, metal deck, EPDM roof, aluminum storefront, hollow metal openings, and coiling doors. Interior finishes include wood and resilient athletic flooring, fluid applied flooring, carpet tile, sound absorbing wall units, and paint. Plumbing work includes: domestic, drain, and sanitary piping; and restroom fixtures. HVAC work includes gas, hydronic, and refrigerant piping; unit heaters, split-system air conditioners, indoor air-handling units, packaged compressor and condenser units, and condensing boilers. Electrical work includes power, lighting, communications, and fire alarm systems; and a diesel powered electrical generator. Bid package #1 also includes a bid alternate located at the high school to remove an existing partition wall in the weight/wrestling room. Bid Package #2 includes providing HVAC Controls for this facility. Lump-sum Bids will be received on a SINGLE PRIME CONSTRUCTION CONTRACT FOR THE ENTIRE WORK. HSR Associates is responsible for distribution of addenda only to those who have requested project documents from HSR in formats described above. HSR Associates will make AutoCAD files available to the Contractor following award of contract. HSR Associates maintains a plan holder list at porta. This list includes only those who have requested plans from HSR and those who have requested to be added our list. Bid Security in the amount of five percent (5%) of the maximum amount of the Bid must accompany each Bid as described in the Project Manual, Instructions to Bidders. The Owner reserves the right to waive irregularities and to reject any or all Bids. Bids may only be withdrawn in accordance with the Project Manual, Instructions to Bidders.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents