Warehouse and Munitions Storage Facility
New Construction, Renovation - 14,000 SF
Design
$5,000,000 to $10,000,000 est. value
Fort Carson, CO 80913

EHRM Infrastructure Upgrades (Const) Denver, CO
Renovation
Bidding
$5,000,000 CJ est. value
Aurora, CO 80045

Consolidated Space Operations Facility, Schriever AFB, Colorado
Post-Bid
$100,000,000 to $160,000,000 est. value
Colorado Springs, CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Cadet Field House Phase 2
Renovation
Results
CO 80840

Integrated Project Delivery Method Utilizing Construction Management/General Contracting (CM/GC) Services
Results
Less than $8,000,000 est. value
Greenwood Village, CO 80112

Sijan Hall Dormitory
Renovation - 700,000 SF
Pending Verification
CO 80840

Joint Cryptologic Center
New Construction - 30,000 SF
Post-Bid
$15,000,000 to $20,000,000 est. value
Aurora, CO 80040

Construct Contract Special Operations Command - North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Results
$45,000,000 to $55,000,000 est. value
Colorado Springs, CO 80914

RHS - United States Air Force Academy Pre-Engineered Building
New Construction - 4,000 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
CO

Montrose Readiness Center Shower Expansion and Remodel
Renovation
Results
$260,000 est. value
Montrose, CO 81401

Repair Code Deficiencies and Life Safety Systems USPFO CIF
New Construction
Post-Bid
$1,170,000 est. value
Centennial, CO

100th MDB National Guard Readiness Center
New Construction
Results
Colorado Springs, CO

RFQ Contractor - Fire Station Support Building
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Fort Carson, CO 80913

RFP D/B - ADAL Fitness Center
Renovation, Addition, Demolition - 5,319 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Colorado Springs, CO 80930

Last Updated 09/23/2022 02:32 PM
Project Title

Building 1000 HVAC Replacement Buckley Space Force Base

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,585,596 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Colorado Army National Guard (COARNG) is renovating Building 1000 located on Buckley Space Force Base. The majority of the project consists of lead remediation and replacement of HVAC and lighting throughout the facility. Other project elements include removal and replacement of all ceiling tile and grid, replace light fixtures and add lighting controls, painting and patching of walls, remove and replace flooring, grinding and polishing concrete floors, and adding HVAC controls Construction Schedule: 300 calendar days from Notice to Proceed to Substantial Completion 30 calendar days for completion of punch list items, warranties, etc. 330 calendar days total construction period Date Email Questions Due July 28, 2022 by 4:00PM Date Email Answers Issued August 3, 2022 by 4:00PM Minimum Requirements Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum: 1. Provided General Contracting services within the last three (3) years for at least two (2) projects each in excess of $2,500,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and 2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and 3. Demonstrated bonding capability up to $3,000,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity. DMVA staff will only be available to assist with access until 9:45AM. If you arrive after staff has left you will not be able to attend. Settlement Notice For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C .R.S. 38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation. Per C.R.S. 24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents