Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Construction of Drainage Project 2021
Bidding
Castle Dale, UT 84513

Neck Fire Chaining
Bidding
Cedar City, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Sunbrook Golf Course Drainage
Bidding
Saint George, UT 84770

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Last Updated 01/21/2021 01:11 PM
Project Title

Ogden Riverbank Erosion EWP Project

Physical Address View project details and contacts
City, State (County) Ogden, UT 84201   (Weber County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $425,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is for the streambank repair and stabilization for five (5) sites along the Ogden and Weber Rivers, known as the Ogden Riverbank Erosion EWP Project (Project). The purpose of the Project is to: 1. Stabilize the bank and remove debris at Site 1. 2. Stabilize the bank and add engineered riffles for grade control at the Marriott Diversion (Site 2). 3. Stabilize the bank and replace the culvert headwall at the 21st Street Outfall (Site 3). 4. Stabilize the bank at Site 4. 5. Stabilize the bank and relocate the Weber River Parkway Trail at Site 5. The primary construction tasks associated with the Project include bank grading; installing boulder bank toe armor; incorporating bioengineering methods such as root wads, live willow staking and native vegetation; implementing scour countermeasures in the form of rock barbs and J-Hooks; demolition and replacement of an existing culvert headwall structure; and relocation of a portion of the Weber River Parkway Trail.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Soil Treatment, Vegetation Control.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Concrete Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents