Similar Projects
Z2da--Replace Cares Tower Flooring & Nurse Stations (541-21-202)
Design
$500,000 to $1,000,000 est. value
Cleveland, OH 44106

New Flooring - Edward M. Selby/Rose Hill Tower
Alteration
Bidding
Martins Ferry, OH 43935

VCT Flooring Improvements 2020
Post-Bid
Columbus, OH

Replacing a Tile Main Involving the Watershed
Post-Bid
OH

M--Tile and Grout Cleaning and Seal
Results
Cleveland, OH 44106

Westfall High School Gym Floor Replacement
Results
Less than $750,000 est. value
Williamsport, OH 43164

NMUSAF Floor Treatment
Post-Bid
Wright Patterson Air Force Base, OH 45433

Dublin Schools Flooring Summer 2020
Results
Less than $162,000 est. value
Dublin, OH

Hardwood Synthetic Sports Flooring
Post-Bid

Furnish and Install Carpet/Flooring and Related Work at Various AMHA Tax Credit Locations
Term Contract
Results
Akron, OH

NMUSAF Flooring
Post-Bid
Wright Patterson Air Force Base, OH 45433

Furnish and Install Carpet/Flooring and Related Work at Various AMHA LIPH Locations
Term Contract
Results
Akron, OH

DOW/OPS-Carpet Installation indianola
Post-Bid
Columbus, OH

Furnish and Install Carpet/Flooring and Related Work at Various AMHA LHA Locations
Term Contract
Results
Akron, OH

DECC 2nd Floor Meeting Room and Hallway Carpet Replacement
Post-Bid
OH

Last Updated 10/07/2021 04:01 PM
Project Title

East 29th Bungalow Floor Repairs

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $58,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is within the Greater Cleveland Regional Transit Authority’s (GCRTA) Joint Territory on which all GCRTA revenue trains operate. The location of the bungalow is on the north side of the tracks and approximately 1,670-feet west of the GCRTA’s E. 34th Street rapid train station. The work includes repair the of the bungalow floor with concrete, cutback and removal of vegetation and installation of foundation around the perimeter of the structure and installation drainage system on the north side of the structure. It will be necessary to do some of the excavation by hand in order to prevent damaging buried utilities.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents