Similar Projects
Runway Safety Area Improvements project
Post-Bid
Jonesboro, AR 72401

Rehabilitation Runway 13-31
Post-Bid
Clinton, AR

Wide Asphalt Access Road at McGehee Municipal Airport
Results
McGehee, AR

Runway 13-31 Rehabilitation
Results
Less than $103,250 est. value
El Dorado, AR

Rehabilitate Apron Areas
Post-Bid
Berryville, AR

Runway 17-35 Complex Asphalt Pavement Rehabilitation
Results
Less than $320,000 est. value
Bentonville, AR

Runway 18-36 Overlay Project
Post-Bid
Magnolia, AR 71753

Terminal Ramp Rehabilitation
Results
Less than $172,785 est. value
Heber Springs, AR 72543

H35 Apron Rehabilitation
Infrastructure
Post-Bid
$400,000 est. value
Clarksville, AR

FYV Runway Pavement and Lighting Rehabilitation
Infrastructure
Results
Less than $7,500,000 est. value
Fayetteville, AR 72701

Runway 13-31 Rehabilitation
Infrastructure
Post-Bid
$220,000 to $275,000 est. value
Hot Springs, AR

Runway 17-35 Rehabilitation
Infrastructure
Results
$115,000 to $145,000 est. value
North Little Rock, AR

Crack Sealing on Taxiway and Apron
Infrastructure
Post-Bid
Searcy, AR 72143

Airfield Pavement Rehabilitation
Infrastructure
Results
$155,000 to $185,000 est. value
Marked Tree, AR

Taxiway Safety Area Improvements Phase I
Infrastructure
Post-Bid
Bryant, AR

Reported 11/19/2021 12:00 AM
Project Title

XNA Concourse a North Apron Expansion

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a concrete apron expansion on the north end of Concourse A terminal apron. The scope of work generally includes the removal of existing concrete pavement, existing asphalt shoulder, and the existing airfield lighting system; the crushing and reuse of the removed concrete pavement; removal and replacement of approximately 7,400 cubic yards of earthwork; construction of approximately 5,600 square yards of apron pavement and 2,400 square yards of apron shoulder; installation of taxiway edge lights, and airfield signage; installation of the underdrain system, temporary and permanent erosion control; and installation of pavement markings as shown on the plans and indicated in the specifications.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents