Similar Projects
Monroe County Middle School HVAC Replacement
Renovation
Sub-Bidding
$380,000 CJ est. value
Tompkinsville, KY 42167

HCAV Ductwork Repair, Barren River Lake
Renovation
Sub-Bidding
$25,000 CJ est. value
Glasgow, KY 42141

Middle-High School HVAC Upgrades in Main and Auxiliary Gyms
Alteration
Post-Bid
Beattyville, KY 41311

HVAC Upgrades Phase A
Infrastructure
Post-Bid
Less than $600,000 est. value
Winchester, KY

HVAC Install at Carr Creek Lake
Term Contract
Results
Sassafras, KY 41759

Restore AHU-10 System or S 5-7
Term Contract
Results
$500,000 to $1,000,000 est. value
Louisville, KY 40206

The Halls HVAC and Miscellaneous Repairs
Renovation
Sub-Bidding
$480,850 CJ est. value
Frankfort, KY 40601

HVAC and Mechanical Services
Term Contract
Post-Bid
Louisville, KY

HVAC Maintenance Repair Services
Alteration
Results
Independence, KY 41051

Central Lab Chillers Installation
Renovation
Sub-Bidding
$964,500 CJ est. value
Frankfort, KY 40601

Woodland Elementary School HVAC Renovation
Alteration
Post-Bid
$3,750,000 est. value
Radcliff, KY 40160

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

DJJ-McCracken Emergency HVAC
Renovation
Sub-Bidding
$371,100 CJ est. value
Paducah, KY 42001

HVAC Preventative Maintenance
Term Contract
Post-Bid
Erlanger, KY

College of Education IAQ Improvements
Alteration
Results
Louisville, KY

Last Updated 08/22/2023 01:36 AM
Project Title

Hancock Biological Station HVAC Renovations

Physical Address View project details and contacts
City, State (County) Murray, KY 42071   (Calloway County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,325,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removal of all HVAC. Provide new temperature controls at new energy recovery air handling unit. Provide new air valves and air terminal units, fan coil units, ductwork, piping, chiller and pad, and new grilles and diffusers. Electrical work includes removal and replacement of existing main distribution panel, new panels, feeders, light fixtures, and work associated with air handling replacements. Provide new ceilings throughout and all general construction associated with air handling unit replacements. Murray State University, Procurement Services, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders and/or General Conditions. JOB NO. 22.MSU.BR061-001 Substantial completion is 120 days from project start date. Final Completion is 150 days from project start date.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents