Similar Projects
Cedar Bay Water Reclamation Facility Backup Power System
Alteration
Bidding
Jacksonville, FL 32218

Circuit 853 Structures 21 to 33 Replacement Project
Alteration
Bidding
Jacksonville, FL 32224

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

UPS Maintenance
Post-Bid
Jacksonville, FL 32212

Annual Electrical Services for City Buildings
Term Contract
Results
Less than $750,000 est. value
Jacksonville, FL

Steel Transmission Poles for the Circuit 830 Structures 30-32 and 42-44 Replacement
Results
Less than $113,912 est. value
Jacksonville, FL

NGS BIEB Unit 2 UPS Replacement
Alteration
Bidding
Jacksonville, FL

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Electrical Maintenance and Repair Services
Results
Jacksonville, FL 32218

Plumbing, Electrical and HVAC Services
Alteration
Bidding
Jacksonville Beach, FL

Substation Battery Bank Testing and Inspection
Term Contract
Post-Bid
Jacksonville, FL 32202

Circuit 684 Pothead Replacement at Kennedy Substation and University Transfer Station
Results
Jacksonville, FL

LED Conversion at Twin Towers
Alteration
Bidding
Jacksonville, FL

Theatre Performance Lighting Purchase and Installation
Post-Bid
Jacksonville, FL

Generator Rental Agreement
Term Contract
Results
Jacksonville, FL

Last Updated 07/22/2021 11:56 AM
Project Title

JEA NGS - N01-N02 PA and SA Fan Silencer Replacement Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32226   (Duval County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement fan silencers for Units 1&2 secondary air (SA) and primary air (PA) fans shall be included. The draft fans shall not impose any restrictions on the normal operation of the unit and shall be designed to operate safely, reliably, continuously, and without undue maintenance over the entire operating load range. The design shall consider steady-state and normal transient conditions.

Details

Division 26 - Electrical.
Division 48 - Electrical Power Generation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents