Similar Projects
23rd street to Highway 50 Mitigation Project - City of Yankton
Infrastructure
Conception
$2,500,000 CJ est. value
Yankton, SD 57078

23rd street to Highway 50 Mitigation Project - City of Yankton
Infrastructure
Conception
$2,500,000 CJ est. value
Yankton, SD 57078

Shoulder Widening, AC Resurfacing, Modify Intersection, ADA, End Blocks
Infrastructure
Design
$10,372,000 CJ est. value
Yankton, SD 57078

Shoulder Widening, AC Resurfacing, Modify Intersection, ADA, End Blocks
Infrastructure
Design
$10,372,000 CJ est. value
Yankton, SD 57078

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Highway 52 Bike Path Asphalt Overlay
Infrastructure
Results
Yankton, SD 57078

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Grading (1.5M CuYd), Interim Surfacing, Replace Structure RCBC
Infrastructure
Results
SD

Highway 52 Water Main Relocation
Infrastructure
Post-Bid
$511,000 est. value
Yankton, SD 57078

Fox Run Golf Course Pump Station
New Construction
Results
$100,000 to $150,000 est. value
Yankton, SD 57078

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Yankton Infrastructure Recovery And Critical Capacity WWTP EDA Improvements
Renovation, Infrastructure, Alteration
Results
Yankton, SD 57078

Cold Applied Plastic Pavement Marking Installation
Infrastructure
Post-Bid
Yankton, SD 57078

Last Updated 01/11/2023 08:40 AM
Project Title

Sanitary Sewer System Improvements - Rebid

Physical Address View project details and contacts
City, State (County) Gayville, SD 57031   (Yankton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $4,593,294 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work covered under this section consists of furnishing all labor, equipment and materials necessary for the cleaning and televising of the existing sewer mains designated on the Drawings. B. This work shall be done prior to any sewer rehabilitation work and shall be used to verify the feasibility of using the CIPP lining procedure as well as identifying any required preparatory work and service locations. It will also be used to identify any locations requiring point excavation and repair, and to locate buried manholes or cleanouts that have not been found. 6" Sanitary Sewer Service 600 LF 8" PVC Sewer Pipe 4,600 LF 48" Manhole 17 EA 8" CIPP Lining 6,700 LF Manhole Lining 17 EA Aggregate Base Course 1,400 TON Gravel Surfacing 1,700 TON Asphalt Concrete Composite 1,400 TON Lift Station 1 LS.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents