Similar Projects
Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Snow/Ice Removal And Lawn Care Service
Term Contract
Post-Bid
Princeton, IL

Job Order Contracting
Term Contract
Post-Bid

Waste and Recycling Pickup
Term Contract
Post-Bid
Tiskilwa, IL 61368

Snow Removal Work in the Village
Term Contract
Post-Bid
Dalzell, IL 61320

Snow Removal Services
Term Contract
Post-Bid
Manlius, IL 61338

Guranteed Energy Savings
Term Contract
Post-Bid
Princeton, IL 61356

Weed Spraying
Term Contract
Post-Bid
Princeton, IL 61356

Grass Cutting for Village Properties Stop
Term Contract
Post-Bid
Ladd, IL 61329

Mowing and Trimming The Forest Hill Cemetery
Term Contract
Post-Bid
Wyanet, IL 61379

Mowing and Trimming Services for the 2023 and 2024 Mowing Seasons
Term Contract
Post-Bid
Spring Valley, IL 61362

Mowing/ Maintenance of the Greenwood Cemetery
Term Contract
Post-Bid
Princeton, IL 61356

Lawn Service Bid or Snow/Ice Removal Bid
Term Contract
Sub-Bidding
Princeton, IL 61356

2023 Street Maintenance
Term Contract
Post-Bid
Sheffield, IL 61361

Last Updated 03/24/2023 07:39 AM
Project Title

Turf Restoration, Aerating, Applying Herbicide and Soil Amendments

Physical Address View project details and contacts
City, State (County) Princeton, IL 61356   (Bureau County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Great Sauk Trail Rest Area grounds on Eastbound and Westbound I-80 in Bureau County at approximately mile marker 51. Region 2 District 3 Federal Project # N/A County(s) Bureau Key Route(s) FAI 80 Marked Route(s) I-80 Section(s) 2023-1 REST AREA State Job #(s) C-93-038-23 PPS #(s) 0-02068-3003 Completion Date: May 30, 2023 Plus 5 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 009 - Turf Restoration, Aerating, Applying Herbicide and Soil Amendments

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents