Similar Projects
Relocation of Vault Toilet
Renovation
Sub-Bidding
$100,000 CJ est. value
Hot Springs National Park, AR 71901

Plumbing Maintenance and Installation
Alteration
Post-Bid
Berryville, AR

Bodcaw Low and Moderate Income (LMI) Plumbing Hookup Project
Alteration
Post-Bid
$100,000 est. value
Bodcaw, AR

Emergency Plumbing - 3020 South Summit
Term Contract
Results
$8,812 est. value
Little Rock, AR 72206

IDIQ General Maintenance at Pine Bluff Site Office
Term Contract
Results
Pine Bluff, AR 71601

Campus Wide Water Fountain Replacement - Bid Package 1 Plumbing
Alteration
Post-Bid
$255,000 est. value
Jonesboro, AR

Sub-Basin S004 Sewer Main Realignment, Rogers Avenue - Waldron to 56th Street
Infrastructure
Results
$1,256,295 CJ est. value
Fort Smith, AR 72903

Thibault Road Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Little Rock, AR 72206

Wastewater System Improvements - Rebid
Renovation
Results
$3,225,910 CJ est. value
Lake City, AR 72437

Pipe, Fittings, and Valves
Term Contract
Post-Bid
Paragould, AR 72450

Highway 49 and North Oak Street Sewer Extension
Infrastructure
Results
$460,829 CJ est. value
Brookland, AR 72417

Sandy Beach Bathroom Improvements - Material Package - Plumbing
Term Contract
Post-Bid
Heber Springs, AR 72543

8-Inch Waterline Replacement
Infrastructure
Results
$130,250 CJ est. value
Waldron, AR 72958

Hot Water Heater Replacement for 170 Dwelling Units
Renovation
Post-Bid
$400,000 CJ est. value
Springdale, AR 72764

Wastewater Collection System Improvements Phase I - Lift Station and Force Main
Demolition, New Construction, Infrastructure
Results
$6,944,410 CJ est. value
Elkins, AR 72727

Last Updated 08/14/2023 11:34 PM
Project Title

Hwy. 104 - Hwy. 365 (Pine Bluff & White Hall) (S)

Physical Address View project details and contacts
City, State (County) Pine Bluff, AR 71601   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project is to Widen Approximately 4.759 Miles of Highways 270 and 365s in Jefferson County. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Portland Cement Concrete Base, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Portland Cement Concrete Driveway, Maintenance of Traffic, Concrete Ditch Paving, Culvert Clean Out, Minor Drainage Structures, Pavement Repair Over Culverts, Fencing, Erosion Control, Concrete Islands, Concrete Walks, Concrete Combination Curb and Gutter, Wheelchair Ramps, Traffic Signal Items, Pavement Marking, and Misc. Items. Routes: 270 & 365s Sections: 11 & 14s County: Jefferson Length: 4.759 Miles in Length. Federal Aid Project ACNHPP-0035(49) Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. In Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. The Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financialassistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 104 - Hwy. 365 (Pine Bluff & White Hall) (S)

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents