Similar Projects
Gas Fired Indoor Duct Furnaces - Crain Unit
Alteration
Bidding
Gatesville, TX 76599

Administration Building Mechanical Renovations
Post-Bid
$3,000,000 est. value
Houston, TX 77024

HVAC System Replacement at Life Middle School Waxahachie
Post-Bid
Waxahachie, TX 75165

HVAC
Term Contract
Results
Fairfield, TX

6515--Liberty Eagle Fume Hoods
Results
Houston, TX 77030

Exhaust Hood & Duct Cleaning - 2 Month Service
Post-Bid
San Antonio, TX 78275

Municipal Complex Heating, Ventilation and Air Conditioning Project
Results
Highland Village, TX 75077

Installation Of Allowable Weatherization Energy Conservation Measures
Term Contract
Post-Bid
Levelland, TX

Replacement of Administration Offices Building Chiller
Results
Mission, TX 78572

Hail Damage Repairs
Alteration
Post-Bid
Junction, TX

Industrial/Commercial Grade A/C Filter Replacement Service for All City Facilities/Buildings
Term Contract
Results
Less than $21,168 est. value
Mission, TX 78572

HVAC Gainesville Junior High School Auditorium
Alteration
Post-Bid
Gainesville, TX 76240

Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Replacement at Annex 60
Results
Less than $2,000,000 est. value
Houston, TX 77093

HVAC Services
Alteration
Post-Bid
Carrollton, TX

Air Compressor
Results
Less than $58,908 est. value
College Station, TX

Last Updated 04/15/2022 12:17 PM
Project Title

135-Ton HVAC

Physical Address View project details and contacts
City, State (County) Beeville, TX 78102   (Bee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $279,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase order for the procurement of 135-ton HVAC to include removal of old unit, delivery, installation of New, Start-up and Training. A. Provide crane service for removal of old unit and installation of new unit B. Disconnect electrical wiring and duct work from old packaged cooling only AC unit. Demolish and remove existing unit. C. Install new packaged DX 135 nominal ton cooling only AC unit on existing pad. D. Unit to have horizontal supply and return air on same side of building E. Make the necessary reconnections of electrical wiring and duct work F. Start up the new equipment and make sure that the equipment is running properly according to manufacturer recommended requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents