Similar Projects
DISD - MLK Arts Academy - Phase IIi
Renovation - 60,000 SF
Conception
$4,000,000 est. value
Dallas, TX 75215

Hamilton Park Pacesetter Magnet School
Renovation
Conception
$10,000,000 est. value
Dallas, TX 75243

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Improvements
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Irving, TX 75038

Street Reconstruction Group 17-1410
Infrastructure
Bidding
$2,500,000 CJ est. value
Dallas, TX 75201

West Dallas STEM School Renovation Phase 1
Renovation
Post-Bid
Dallas, TX 75212

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Construction Management at Risk - Multiple Projects Package 2019-2
Addition
Results
Mesquite, TX 75150

CMAR 2019 Bond Program Phase 1 Projects
Results
Less than $144,213,000 est. value
Mesquite, TX 75150

Jesuit High School Addition
Addition
Construction
Dallas, TX 75244

MISD Choice High School
Construction
Mesquite, TX 75150

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

Hanover Southgate Mixed Use
New Construction, Infrastructure
Conception
$85,000,000 CJ est. value
Grand Prairie, TX 75050

Last Updated 12/01/2022 11:07 AM
Project Title

ORG 021 - WT White High School - Addition and Renovation

Physical Address View project details and contacts
City, State (County) Dallas, TX 75244   (Dallas County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $14,496,728 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

** As of December 1, 2022, this project has not yet been awarded. The project is expected to be awarded on December 15, 2022.** Completed CSP Package Part 1-A, 1-B and 1-C Project consists of the following: 1. Updated Theatrical AV Systems in Auditorium. 2. Updated Classroom teaching surfaces and finishes in original classrooms. 3. Repaint all interior surfaces 4. New ancillary locker room buildings at baseball and softball fields. 5. Window and Glazing Replacements in parts of campus. 6. Renovate existing small gym, clinic and science prep areas. 7. Updating lighting to LED lighting on interior and exterior of building. 8. Cleaning and sealing of exterior masonry 9. Repainting all exterior painted surfaces. 10. Interior Door and hardware replacements. 11. City and private sidewalk and curb curt replacements 12. Softball Bleachers upgrades 13. Security and clock updates 14. Landscaped areas updated and replacements. 15. Pavement Resurfacing and restriping of existing teacher and staff parking lots. 16. Domestic water line replacements 17. Sanitary sewer replacements 18. Various HVAC equipment replacements and upgrades 19. Sump pump replacements. 20. Security System repairs and access control improvements 21. Demolition and abatement 22. Furniture Moving PN - 21222, 21028.000 Addendum #1 has been issued as of 9-13-2022. Note from Sedalco Construction: Due to delays related to permitting for the portable buildings to be utilized for swing space on this project, work on site for this project is anticipated to start in May of 2023. This dealy will also push the overall duration of the project to 24 months instead of the posted duration in the project documents. Please take this in to consideration when developing our proposals. Please submit all proposals to bids@sedalco.com Call Justin King at SEDALCO with questions (817) 831-2245

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents