Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Langhorne-Yardley Rd Intersection
Infrastructure
Conception
$7,841,000 est. value
Perkasie, PA

Old Bethlehem Road O/Kimple
New Construction, Infrastructure
Design
Quakertown, PA

Oxford Vally at Lincoln Highway
Infrastructure
Design
Perkasie, PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Rubberized Crack Seal
Term Contract, Infrastructure
Bidding
Quakertown, PA

Wharf-N Sinkhole Repair
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Philadelphia, PA

Asphalt Resurfacing Between Milepost 345.73 and Milepost 353.49
Infrastructure
Post-Bid

2021 Roadway Resurfacing Project
Results
Bensalem, PA

Pfaff Elementary School Paving and Sidewalk Repairs
Results
$250,000 est. value
Quakertown, PA 18951

Lawn Ave : Maple - Farmers -
Infrastructure, Alteration
Design
Perkasie, PA

2022 Road Program - Paving Part 2
Infrastructure
Bidding
$300,000 est. value
Doylestown, PA

2022 Road Projects
Infrastructure
Post-Bid
Upper Black Eddy, PA

2021 Road Program
Results
$664,061 est. value
Yardley, PA 19067

PA 313: Ferry - Broad St
Alteration
Design
$16,640,000 est. value
Doylestown, PA 18902

Last Updated 07/11/2022 06:57 AM
Project Title

2022 Roadway Improvement Program

Physical Address View project details and contacts
City, State (County) Feasterville, PA   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $635,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract will generally include the mill and overlay of 13 Township roadways (36,905 SY/3,425 TON). The Contract will also include 3,000 SY of pavement repair, 660 TON leveling/scratch course and the replacement of all pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents