Similar Projects
Resurface - SH 1
Infrastructure
Design
$3,500,000 CJ est. value
Mill Creek, OK 74856

Resurface - SH 1
Infrastructure
Design
$3,500,000 CJ est. value
Mill Creek, OK 74856

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Widen and Resurface - SH 48
Infrastructure
Design
$11,000,000 CJ est. value
Wapanucka, OK 73461

ODOT Water Line Relocation
Infrastructure
Post-Bid
$400,000 CJ est. value
Wapanucka, OK 73461

Utilities
Infrastructure
Design
$932,931 CJ est. value
Tishomingo, OK 73460

Renovation / Addition Project for the Middle/High School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Tishomingo, OK 73460

Widen and Resurface - SH 78
Infrastructure
Design
$10,400,000 CJ est. value
Milburn, OK 73450

Construction of a New Parking Area and Canopy
Infrastructure
Post-Bid
$100,000 CJ est. value
Tishomingo, OK 73460

Utilities - SH 7
Infrastructure
Design
$500,000 CJ est. value
Tishomingo, OK 73460

Last Updated 03/30/2023 12:34 AM
Project Title

Bridge Rehabilitation - SH 48

Physical Address View project details and contacts
City, State (County) Wapanucka, OK 73461   (Johnston County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-48: Over Sandy Creek, 3.20 Mi South of Jct Sh-7 As of March 30, 2023, the project is in Design status. Anticipated letting month/year is November, 2023. Length : 0.400 Mi OKDOT - Bridge Rehabilitation - SH 48 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents