Project Title | COED Residence Hall Fan Coil Controls Upgraded and Integration on BMS |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10001 (New York County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $590,651 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions accepted up to March 17, 2023 on or before 3:00 PM Send ALL questions to purchasing at: purchasingbids@fitnyc.edu Provide labor, materials, tests, tools and equipment to complete the coed Residence Hall Fan Coil Controls Upgrade and Integration on BMS Project. Contractor may begin survey and procurement of materials immediately following award . The installation of all equipment in accordance with the Manufacturer's Installation/Operation & Maintenance Manuals & Instructions shall be followed. 1. Power distribution system - 120/208 Volt, Distribution Switchboards. 2. Raceways and installation components. 3. Wire and Cable. 4. Grounding system in conformance with applicable codes. 5. Wiring devices. 6. Furnishing and setting of all sleeves through the floors and wall, where required including waterproofing and fireproof sealing and cap flashing. 7. The Contractor shall be responsible for maintaining the fire resistance rating of any rated wall, ceiling or floor for which his work partially or fully penetrates. Work which could potentially penetrate or breach a rated wall, ceiling or floor include, but are not limited to flush-mounted recessed panel boards, conduit and pipe, ducts, equipment, supports or reinforcements. For any such situation, the Contractor shall provide the necessary fire stopping material, insulation or system in order to maintain the fire rating of the wall, ceiling or floor. The Contractor is responsible for reviewing the building construction drawings, including those of the architectural and structural trades, in order to determine the fire resistance ratings for the walls, floors and ceilings for which their work will partially or fully penetrate. 8. Cutting and core drilling associated with electrical work. 9. Prime painting, where required for electrical equipment and installation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |