Similar Projects
Primrose Office Park
New Construction - 7,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Southlake, TX

One Medical
Build-Out - 4,978 SF
Design
$700,000 est. value
Fort Worth, TX

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Westpark Relief Elementary
New Construction - 120,000 SF
Post-Bid
$36,500,000 est. value
Fort Worth, TX

Police Headquarters Project
New Construction, Renovation - 50,000 SF
Results
$22,000,000 est. value
Mansfield, TX 76063

Claffey Pools Office Building
New Construction - 7,600 SF
Construction
$1,500,000 est. value
Southlake, TX 76092

Haltom City Business Park
New Construction - 951,000 SF
Construction
$44,000,000 est. value
Haltom City, TX 76117

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Veterinary Emergency Group - Build Out / Fort Worth
Renovation, Infrastructure - 5,100 SF
Pending Verification
$1,000,000 CJ est. value
Fort Worth, TX 76116

Sunshine Pediatric Day Center
New Construction - 7,355 SF
Design
$2,000,000 est. value
Forest Hill, TX

RFQ D/B - Design Build Services for New Parking Garage for the District
New Construction, Infrastructure
Post-Bid
$11,520,000 CJ est. value
Fort Worth, TX 76104

Nolen Office Park Phase II
New Construction - 109,600 SF
Construction
$3,000,000 est. value
Southlake, TX 76092

Wallbox TX Plant / Forum Dr
Addition, Demolition, Infrastructure - 149,241 SF
Pending Verification
$19,000,000 CJ est. value
Arlington, TX 76010

Tehama Ridge Salons and Office Suites
New Construction, Renovation, Infrastructure - 29,522 SF
Design
$5,900,000 CJ est. value
Fort Worth, TX 76177

Design Build Services - JPS Medical Home
New Construction
Post-Bid
TX

Last Updated 05/01/2023 12:01 PM
Project Title

Mental Health Jail Diversion Center Renovation Project

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76104   (Tarrant County)
Category(s) Commercial, Government/Public, Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Office, Parking Garage, Prison/Jail
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,277,236 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mental Health Jail Diversion Center Renovation Project The deadline for receipt of all questions is 12:00 p.m., CST, Tuesday, January 31, 2023. After this deadline, all questions and responses will be posted electronically. All questions must be submitted in writing and directed to Elizabeth Pietzsch, CPCM, Senior Contracts Administrator, via fax at 817-884-2629 or, if unable to fax, email to BidQuestions-RSVP@tarrantcounty.com. The email must include the RFB No. in its subject and confirmation of receipt by Tarrant County is required. The original bid must be clearly marked "ORIGINAL" and contain all original signatures. "No-Bid" Response is to be returned on the form included in the section under Forms. Any bid received after the date and/or hour set for bid opening will not be accepted. The bidder will be notified and will advise Tarrant County Purchasing Department as to the disposition by either pick up, return at Bidder's expense, or destroyed with written authorization of the Bidder. If bids are sent by mail to the Tarrant County Purchasing Department, the Bidder shall be responsible for actual delivery of the bid to the Tarrant County Purchasing Department before the advertised date and hour for opening of bids. If mail is delayed either in the postal service or in the internal mail system of Tarrant County beyond the date and hour set for the bid opening, bids thus delayed will not be considered and will be disposed of as authorized. Description - This project includes interior renovation of selected areas as indicated on the drawings, the addition of a new 2-car parking garage, with storage room, office and restroom. Interior renovation scope includes, but is not limited to, conversion of first and second floor bathrooms to offices, remodeling of a second floor laundry to an office, addition of partitions and a door to create a new office at the second floor, addition of doors in the first and second floor cross corridors, modification of the entry to the first floor kitchen, modifications as required for the addition power, water, drain line and dryer exhaust line for a second set of washer and dryer at the first floor laundry, removal of a door and enlargement of an opening at the first floor dining room, and room identification signage. The new parking garage scope includes, but is not limited to, demolition of an existing fence, removal of the concrete driveway, removal of the adjacent patio, construction of a new parking garage with load bearing CMU walls, steel beam roof framing, drilled pier foundation with structural slab on carton forms, PVC roof, overhead garage doors, unit heaters, LED lights, and related landscape and irrigation. At the north end of the main building, scope includes addition of a new fence and gate to enclose the patio, and salvage of an existing storage shed for return to the Owner.

Details

5 Stories Above Grade, 1,400 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Entrances and Storefronts, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Detention Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Healthcare Communications and Monitoring Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents