Similar Projects
Interagency Natural Resource Center (INRC) Water Heater Repair / Water Treatment / Filtration
Renovation
Sub-Bidding
$100,000 CJ est. value
Coeur D Alene, ID 83815

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Replace Sink
Alteration
Post-Bid
ID

2020 Downtown Boise Implementation Plan (DBIP) Phase 2 - Rebid
Infrastructure
Results
$14,347,568 CJ est. value
Boise, ID 83702

2022, East Ustick Road Trunk Line, Dixie Drain to Florida Avenue
Infrastructure
Results
$1,244,889 CJ est. value
Caldwell, ID 83605

exp - Holt Arena President's Deck Mechanical and Plumbing
Alteration
Post-Bid
$200,000 est. value
Pocatello, ID

Spring Valley Wastewater Treatment Plant Phase 1
New Construction, Infrastructure
Results
$17,087,277 CJ est. value
Eagle, ID 83616

Vault Toilet Pumping Service
Term Contract
Post-Bid
Boise, ID 83702

Pullman Highway Transmission Water Main
Infrastructure
Results
$1,519,761 CJ est. value
Moscow, ID 83843

FY22 Capital Maintenance, Phase 1, Boise
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Boise, ID 83702

65th North Water Main - Glen Abby Cir to Idaho Canal
Infrastructure
Results
$115,552 CJ est. value
Idaho Falls, ID 83401

Wastewater Treatment Plant Dewatering Project
New Construction, Renovation, Infrastructure
Post-Bid
$9,500,000 CJ est. value
Idaho Falls, ID 83402

High Density Polyethylene Pipe (HDPE) Lining
Term Contract
Post-Bid
Boise, ID 83702

D2 Materials Lab Remodel - Bid Package 2
Renovation - 8,665 SF
Post-Bid
$500,000 CJ est. value
Lewiston, ID 83501

Septic Pumping
Infrastructure
Post-Bid
$20,000 CJ est. value
Boise, ID 83702

Last Updated 07/11/2023 04:34 AM
Project Title

Cabinet Mountains Water District - Water System Improvements Project - Phase - 2

Physical Address View project details and contacts
City, State (County) Bonners Ferry, ID 83805   (Boundary County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $7,692,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes a wide array of water system improvement projects located throughout the District that include the following Work: Construction of concrete water tanks, four new booster stations, well facility, water system retrofits, and other miscellaneous water system improvements. Work also includes water lines, site work, buildings, controls/communications, and restoration associated with the improvements. Electrical and Controls, Water Transmission Pipelines, Construction, Removal and Replacement of pipe, Water Storage Tank, Elevated - Ground Storage Tanks, Masonry Construction & Restoration, Water and Wastewater Facilities, Pumps or Pump stations, Grubbing & Clearing, Waterlines The major project elements for the Water Improvements construction project are listed below. This list is not all inclusive, and does not relieve the Contractor of the requirements of the Plans and Specifications: 1. Civil Site Work a. Earthwork excavation for new structures. b. Placement of all backfill including native and imported materials. c. Yard piping including new water line, fire hydrants, and other utilities as shown on the drawings. d. Final grading for roadways, buildings (slab-on-grade) and tanks. 2. Crossport Well a. Building addition, stick built b. New well pump and associated mechanical piping c. Flow meters and valves. d. Plumbing e. All electrical items including, lighting, control panels, outlets, motor control centers, and related accessories. 1) New Generator 3. Parker Canyon Tanks and Booster a. New partially buried concrete water storage tank b. New booster station building c. Yard piping, including fittings and valves d. New booster station pumps, and associated mechanical piping, including flow meters, valves, and fittings. . Plumbing f. Abandon existing booster station upon completion of the above improvements g. All electrical including lights, raceways, wiring, control panels, standby generator, motor control center, SCADA system and all accessories. 4. Highland Flats Booster a. New booster station building b. Yard piping, including fittings and valves c. New booster station pumps, and associated mechanical piping, including flow meters, valves, and fittings. d. Plumbing e. All electrical including lights, raceways, wiring, control panels, standby generator, motor control center, SCADA system and all accessories. 5. Highland Flats Tank a. Gravel Access Road Improvements b. Water main and valving c. Circular, partially buried concrete tank d. Site Civil Improvement 6. Black Mountain Tank and Booster Station a. Installation of two new pumps, and a new flow meter b. Removal of an existing pump c. Concrete Tank crack repairs 7. Mountain Meadows Booster Station a. New booster station building b. Yard piping, including fittings and valves c. New booster station pumps, and associated mechanical piping, including flow meters, valves, and fittings. d. Plumbing e. All electrical including lights, raceways, wiring, control panels, standby generator, motor control center, SCADA system and all accessories. 8. Kootenai Trail Booster Station a. New booster station building b. Yard piping, including fittings and valves c. New booster station pumps, and associated mechanical piping, including flow meters, valves, and fittings. d. Plumbing e. All electrical including lights, raceways, wiring, control panels, standby generator, motor control center, SCADA system and all accessories. 9. Pleasant Valley Pressure Relief Valve Station a. Installation of new pressure relief valve b. Electrical improvements, including connection of station to the grid

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents