Similar Projects
Lewis F. Powell Jr. U.S. Courthouse Exterior Envelope Renovation
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Richmond, VA 23219

Restoration of EPDM Roof
Post-Bid
Clifton Forge, VA 24426

Kempsville High School Roof Replacement and Partial HVAC Replacement
Results
Virginia Beach, VA 23464

A.S. Rhodes Elementary School Roof Replacement
Results
Front Royal, VA 22630

Civic Center Roof Replacement
Post-Bid
$500,000 est. value
Salem, VA 24153

Pentagon RDF Roof Repair - PHASE 2
Results
$10,000,000 to $25,000,000 est. value
Washington, DC - Arlington, VA 20301

Washington Liberty Roof Coating Restoration
Post-Bid
Arlington, VA 22201

M.M. Pierce ES Shingle Roof
Results
$111,672 est. value
Remington, VA

Pre-Qualification for Annaburg Manor Roof Replacement and Cornice Reconstruction
Post-Bid
Manassas, VA 20110

Farmington Elementary School Roof Replacement
Results
Culpeper, VA 22701

Peter Muhlenberg Middle School and Ashby Lee Elementary School Roof Replacements
Post-Bid
$800,000 est. value
Quicksburg, Woodstock, VA 22847

North Warren Volunteer Fire Station Roof Replacement Project
Results
Front Royal, VA 22630

Re-Roofing Krug, Finley, East, West
Results
Fairfax, VA 22030

Z--MAWA - Porch Roof Repairs
Results
$100,000 to $250,000 est. value
Richmond, VA 23219

Kenmore Roof Coating Restoration
Results
Arlington, VA 22204

Last Updated 04/20/2021 10:39 AM
Project Title

York High School Partial Roof Replacement and Coating

Physical Address View project details and contacts
City, State (County) Yorktown, VA 23692   (York County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $299,999
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

York High School Partial Roof Replacement and Coating: The removal and replacement of existing low-slope bituminous roof and insulation (approximately 40,000 SF), and application of a new semi-reinforced coating over the entire project roof area (approximately 140,000 SF). Also included is removal and replacement of metal gutters and downspouts, rework of treated wood blocking, metal flashings and counterflashings, and associated work.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, High-Performance Coatings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents