Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Lawn Care and Snow Removal 2022-2024
Term Contract
Bidding
Benton Harbor, MI

Scrap Tire Removal, Hauling and Disposal
Term Contract
Post-Bid
MI

Removal of Litter and Debris Disposal
Post-Bid
Shelby Township, MI

Campus Wide Trash and Recycling Services
Results
Rochester, MI

Cell 2 GAP and Phase 3 Cover Construction
Results
Ravenna, MI 49451

Solid Waste and Recycling Services
Post-Bid
Ann Arbor, MI

Hauling and Disposal of Dirt and Debris
Term Contract
Results
Troy, MI

Snow Removal Services, US Post Office and Courthouse, Marquette, MI
Post-Bid
Marquette, MI 49855

Ottawa National Forest North Zone Marking Contract 1
Results

Flood Debris Removal Equipment Services
Term Contract
Post-Bid
Midland, MI 48640

Item 28 - Transportation and Disposal of Non-Hazardous Materials
Term Contract
Results
Flint, MI 48503

DNR- TSP Indian River - Indian River Red Pine; 57.5 Acres
Post-Bid
Lansing, MI 48909

Port Huron North Pit
Infrastructure
Results
Benton Harbor, MI

DNR- TSP Newberry - Comp 079; 92.8 Acres
Post-Bid
Lansing, MI 48909

Reported 10/13/2021 12:00 AM
Project Title

2021-2022 Snow Removal

Physical Address View project details and contacts
City, State (County) Paw Paw, MI 49079   (Van Buren County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) Main Courthouse and Annex Building (212 E. Paw Paw St.) – Push snow to centerline of north parking spots and remove snow at Buildings & Grounds Director’s discretion. 2) Administration Building (219 E. Paw Paw St.) – Push snow to west ends of lot and remove at Buildings & Grounds Director’s discretion. 3) County jail complex and parking lot on St. Joseph Street on the south side of the jail – Push snow to south end of both lots. Remove snow at Buildings & Grounds Director’s discretion. 4) 213 S. Niles St. parking lot and garage drive – Push snow to east line and behind garage. Keep garage clear. 5) Human Services Building at 753 & 801 Hazen Street and road leading to building and lots – Push snow to lot edges. 6) Do not push snow onto sidewalks 7) Minimum Equipment: Two (2) 18 yd. trucks, One (1) Front End Loader, Two (2) Operators

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents