Similar Projects
Last Updated | 09/18/2021 02:30 AM |
Project Title | Resurfacing Reed Road from the West Village Limits to Lakewood Road in the Village of Lake in the Hills |
Physical Address | View project details and contacts |
City, State (County) | IL (McHenry County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 21101625 Sq Yd Topsoil Furnish And Place, 6" Base Items 60.000 25000110 Acre Seeding, Class 1a Base Items 0.250 25100630 Sq Yd Erosion Control Blanket Base Items 60.000 28000510 Each Inlet Filters Base Items 10.000 40600290 Pound Bituminous Materials (Tack Coat) Base Items 3,181.000 40600982 Sq Yd Hot-Mix Asphalt Surface Removal - Butt Joint Base Items 101.000 40603200 Ton Polymerized Hot-Mix Asphalt Binder Course, Il-4.75, n50 Base Items 198.000 40604060 Ton Hot-Mix Asphalt Surface Course, Il-9.5, Mix "d", n50 Base Items 528.000 44000159 Sq Yd Hot-Mix Asphalt Surface Removal, 2 1/2" Base Items 4,713.000 44000500 Foot Combination Curb And Gutter Removal Base Items 220.000 44201737 Sq Yd Class d Patches, Type i, 8 Inch Base Items 10.000 44201741 Sq Yd Class d Patches, Type Ii, 8 Inch Base Items 20.000 44201745 Sq Yd Class d Patches, Type Iii, 8 Inch Base Items 20.000 44201747 Sq Yd Class d Patches, Type Iv, 8 Inch Base Items 30.000 60260100 Each Inlets To Be Adjusted Base Items 6.000 60603800 Foot Combination Concrete Curb And Gutter, Type b-6.12 Base Items 220.000 67100100 l Sum Mobilization Base Items 1.000 70102620 l Sum Traffic Control And Protection, Standard 701501 Base Items 1.000 70102635 l Sum Traffic Control And Protection, Standard 701701 Base Items 1.000 70102640 l Sum Traffic Control And Protection, Standard 701801 Base Items 1.000 70300100 Foot Short Term Pavement Marking Base Items 142.000 70300150 Sq Ft Short Term Pavement Marking Removal Base Items 48.000 70300210 Sq Ft Temporary Pavement Marking Letters And Symbols Base Items 37.000 70300220 Foot Temporary Pavement Marking - Line 4" Base Items 2,352.000 70300240 Foot Temporary Pavement Marking - Line 6" Base Items 238.000 70300260 Foot Temporary Pavement Marking - Line 12" Base Items 126.000 78000100 Sq Ft Thermoplastic Pavement Marking - Letters And Symbols Base Items 37.000 78000200 Foot Thermoplastic Pavement Marking - Line 4" Base Items 2,352.000 78000400 Foot Thermoplastic Pavement Marking - Line 6" Base Items 238.000 78000600 Foot Thermoplastic Pavement Marking - Line 12" Base Items 126.000 x7030005 Sq Ft Temporary Pavement Marking Removal Base Items 1,029.000 z0013798 l Sum Construction Layout Base Items 1.000 z0030850 Sq Ft Temporary Information Signing Base Items 52.000 z0033700 Foot Longitudinal Joint Sealant Base Items 1,249.000 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |