Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Brundage Estates Residential Subdivision
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Mechanical Site Prep and Piling
Infrastructure
Bidding
$32,400 CJ est. value
Boise, ID 83702

The Boise State University ESI Construction Management Building
New Construction, Infrastructure - 16,200 SF
Sub-Bidding
$5,000,000 CJ est. value
Boise, ID 83706

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

Parkcenter Park Pump Station Improvements
Renovation
Results
Boise, ID 83706

Construction of the Palmer Lift Station Upgrade Project
Renovation
Results
$350,000 est. value
Eagle, ID 83616

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Ann Morrison Park Drive / Multi Residential
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Boise, ID 83706

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Cloverdale Road, Victory Road / Overland Road - Ada County Highway District
Infrastructure
Conception
$1,250,000 CJ est. value
Boise, ID 83709

Last Updated 02/10/2023 06:42 AM
Project Title

City of New Meadows Water System Improvements Project

Physical Address View project details and contacts
City, State (County) New Meadows, ID 83654   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,613,549 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes two phases of work identified as "Package A" and "Package B" in the Drawings. Package A includes installation of a submersible turbine pump, motor, and pitless unit at the City's Well No. 5, construction of a well house and related mechanical, electrical, and control equipment, site work and grading, and extension of a gravel access road to the well site. Package B includes demolition and removal of the City's existing booster station and welded steel storage reservoir, construction of a new booster station and bolted steel tank storage reservoir, and installation of related piping, mechanical, electrical, and control equipment. PN - 19-057, 19215, 197.0010.01

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents