Similar Projects
Riverfront Master Plan
New Construction
Design
Plainfield, IL 60544

Ballard Farm Single Family Homes
New Construction
Design
Plainfield, IL 60544

2021 Renovations
Renovation
Bidding
Homer Glen, Lockport, IL 60491

(1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and Replacement (Single Pass), Pavement Patching, Pavement Markings
Bidding
Bolingbrook, Romeoville, IL 60440

Roadway Reconstruction, Water Main Installation, Storm Sewer Installation, Sidewalk Reconstruction
Post-Bid
Lockport, IL

2021 Playground Improvements - Brookmeadow and Sandalwood Parks
Post-Bid
Less than $400,000 est. value
Frankfort, IL 60423

Police Department Parking Lot Improvements
Results
$447,613 est. value
Plainfield, IL 60544

FY21 Sidewalk and Curb Replacement
Results
Mokena, IL 60448

Holy Family Parish Building
Addition - 14,005 SF
Pending Verification
Shorewood, IL 60404

Resurfacing, Curb and Gutter, Sidewalk Replacement, Ornamental Lighting, Brick Paver Sidewalk, Landscaping and Pavement Markings
Bidding
Lockport, IL 60441

Four Seasons Park Tennis Court Refurbishment
Post-Bid
Shorewood, IL

Dellwood Shop Parking Lot and Drive Paving
Results
Lockport, IL 60441

(2.78-Mile) Smart Overlay, ADA Improvements: HMA Removal and Replacement (Single Pass), Pavement Patching, Pavement Markings
Bidding
Joliet, IL 60436

Lake Strini Improvements.
Post-Bid
Romeoville, IL

2020 Curb and Sidewalk
Results
Plainfield, IL 60544

Last Updated 11/12/2020 05:07 PM
Project Title

New Lenox School District #122 - 2021 Capital Improvements

Physical Address View project details and contacts
City, State (County) New Lenox, IL 60451   (Will County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes: Asphalt pavement reconstruction, asphalt seal coat and crack fill, asphalt pavement patch, sidewalk replacement; curb replacement, new concrete pavement, track surface refurbishment, new long jump runway and sand pit, and painting.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents