Similar Projects
Heating, Ventilation and Air Conditioning Services
Term Contract
Sub-Bidding
Irvine, CA 92606

HVAC Preventative Maintenance and Repair Services
Term Contract
Sub-Bidding
Orange, CA 92866

Pollak Library South HVAC Duct Cleaning
Alteration
Post-Bid
Fullerton, CA 92831

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Fullerton DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Fullerton, CA 92832

HVAC Upgrade at the District Operations Center
Alteration
Results
Santa Ana, CA 92799

Fullerton College Swing Space
Renovation, Alteration
Results
$420,000 est. value
Fullerton, CA 92832

Police Headquarters Lobby Roof and HVAC Rehabilitation
Term Contract
Post-Bid
Orange, CA 92867

Golden West College LRC Duct Work Replacement
Renovation, Alteration
Results
$400,000 est. value
Huntington Beach, CA 92647

Heating, Ventilation, Air Conditioning and Refrigeration Parts and Equipment
Term Contract
Post-Bid
Tustin, CA

Heating, Ventilation and Air-Conditioning (HVAC) Preventative Maintenance and Repair Services
Alteration
Results
CA

Eastbluff HVAC Replacement
Alteration
Post-Bid
$1,900,000 est. value
Newport Beach, CA 92660

Various Facilities HVAC Replacement
Alteration
Results
$138,000 est. value
Costa Mesa, CA 92626

Anaheim High School Hydronic Replacement
Alteration
Post-Bid
$400,000 est. value
Anaheim, CA 92805

Anaheim West Tower HVAC Rehabilitation and Related Work
Term Contract
Results
$6,000,000 est. value
Anaheim, CA 92805

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Orange, CA

Last Updated 11/16/2022 09:25 AM
Project Title

City Hall and Bell Tower Regional Community Center HVAC Interior Controls Replacement - ARPA

Physical Address View project details and contacts
City, State (County) Rancho Santa Margarita, CA 92688   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $64,450 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work is comprised of public works construction including removing and/or replacing HVAC interior controls such as thermostats, controllers, gateways, receivers, actuators, wireless modules, and other miscellaneous improvements as shown on the plans and as required to complete the work. Bidders are hereby advised that this Project is funded in whole, or in part, with funding provided under the American Rescue Plan Act of 2021, Public Law No. 117-2 ("ARPA'). The Contractor to whom the contract is awarded will be required to comply, and require compliance by all subcontractors, with all applicable federal laws and regulations in performing work under this Agreement, including, but not limited to, Section 602 of the Social Security Act and the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, 2 CFR part 200. The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. Within three (3) business days of bid opening, contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within five (5) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement and Insurance. Within ten (1 0) working days after the date of the Notice of Award, the successful bidder will be required to submit Bonds (Faithful Performance and Material and Labor), and Construction Schedule The Contractor shall possess a valid Class C-20 - HVAC Contractors License at the time of submitting bids, in accordance with provisions of Chapter 9, Division Ill of the California Business and Professions Code. The wage rates applicable to this Project are the State of California Department of Industrial Relations prevailing rates of per diem wages and the U.S. Davis-Bacon Wage Rates for Federally-Funded Projects. Not less than higher of the State or Federal prevailing wage rates shall be paid for work on this Project. In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem wages as determined by the State Director of Industrial Relations are available at City Hall, which shall be made available to any interested party upon request, or on the Internet at the State Department of Industrial Relations website under Statistics and Research. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor to pay not less than said specified rates to all workers employed by them in the execution of the contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770- 1781 A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 41 04 of the Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771 .1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payments by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments. The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City. For any questions regarding acquisition of Contract Documents, contact Tri Nguyen at tnguyen@cityofrsm.org.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents