Similar Projects
Heating, Ventilation and Air Conditioning (HVAC) System Replacement at the Cleveland Odom Clinic
Alteration
Bidding
$650,000 est. value
Houston, TX 77026

HVAC Installation Services
Alteration
Bidding
$408,000 est. value
Mabank, TX

Woodland Acres Middle School HVAC Replacement
Post-Bid
Houston, TX 77015

7.5 and 15 Ton HVAC
Post-Bid
Dayton, TX 77535

Air and Water Cooled Chiller Annual Inspections and Preventative Maintenance
Term Contract
Results
Corpus Christi, TX 78411

Building Automation System (BAS) Replacement - North Texas Region
Results
$1,791,763 est. value
Abilene, Mexia, Pollok, Rusk, Wichita Falls, TX 75969

HVAC and Lighting Renovations to Module E of the Community Services Center (CSC)
Alteration
Post-Bid
Waco, TX

Replacement of the Animal Adoption Center HVAC System
Results
Less than $675,000 est. value
Schertz, TX 78154

Replacement AHU
Alteration
Post-Bid
$225,000 est. value
Porter, TX 77339

Sheet Metal Duct Work to Include Grills
Results
Less than $1,776 est. value
Edinburg, TX 78542

Emergency Repair Services For Chillers 1 and 2 at TXDOT Pharr District Headquarters Facility
Alteration
Post-Bid

Portable Air Cleaning Units for Offices and Small Areas
Alteration
Results
Weslaco, TX

HVAC / Insulation
Alteration
Post-Bid
Douglass, TX

County Jail`s Chiller and Pump
Alteration
Results
$68,201 est. value
Bay City, TX

AC Units Mercedes Field Office USIBWC
Term Contract
Post-Bid
Mercedes, TX

Last Updated 05/13/2022 04:31 PM
Project Title

Air Cooled Chiller for FMC Carswell

Physical Address View project details and contacts
City, State (County) State-Wide: TX
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The FBOP, FMC Carswell, in Fort Worth, Texas, seeks supply service to provide Startup for one 55 ton semi-hermetic air cooled chiller. FBOP staff installed the Chiller and are requiring training and initial startup of the system. The building is 14,630 square

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Absorption Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents