Similar Projects
Oaktown Storm Water Drainage System Improvement
Bidding
Oaktown, IN

Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

8th & Ohio Drainage Improvement
Results
Jeffersonville, IN 47130

Southeastway Septic System
Results
$70,000 to $80,000 est. value
Indianapolis, IN 46225

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Storm Water Improvements
Post-Bid
Coatesville, IN

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Wagner Tile (Upper) Regulated Stormwater Drain Reconstruction Sections 19
Post-Bid
Less than $180,600 est. value
Fort Wayne, Yoder, IN 46798

Michigan and Evans Sewer Replacement
Results
Evansville, IN 47708

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Auman Neighborhood Drainage Improvements
Results
Carmel, IN 46032

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Last Updated 07/15/2020 05:54 PM
Project Title

Grace Street Storm Sewer Improvement

Physical Address View project details and contacts
City, State (County) Highland, IN 46322   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $565,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the furnishing of all equipment, labor and materials for the construction of approximately 1,373 linear feet of storm sewer ranging in diameter from 8" to 42". The project also consists of approximately 3,100 square yards of milling and 1 1/2 inches of asphalt surface course. The work includes backfilling, grading, sidewalk restoration, landscaping restoration, pavement restoration and all other related work and appurtenances. Location: Two miles south of I-80 and 1.25 miles east of US 41

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents