Similar Projects
500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

Freedom boulevard - Center to 300 North (12" Line) - City of Provo
Alteration
Conception
$2,000,000 est. value
Provo, UT 84601

1000 West - One-Way to Two-Way Conversion
Infrastructure
Bidding
$200,000 est. value
Pleasant View, UT 84414

3300 South Pipeline Project Phase 1
Infrastructure
Bidding
$900,000 est. value
West Jordan, UT

Jensen Water Improvement District - Water Improvements Project 2021
Post-Bid
Vernal, UT

River Bottom Improvement Project Prequalification
Post-Bid

Road Improvements Project
Results
Price, UT 84501

2020 2000 South PRV Project
Results
Orem, UT 84058

Millrace Repair - 800 North to 500 North - City of Provo
Alteration
Conception
$500,000 est. value
Provo, UT 84601

2022 Bulk Water Stand Pipe
Infrastructure
Bidding
$2,000,000 est. value
Erda, UT 84074

Water Master for The 2021-2022
Term Contract
Post-Bid
UT

11800 South Water Meter / PRV Vault Project
Results
Riverton, UT

FJ Gillmor Subdivision Construction Project
Infrastructure
Bidding
$300,000 est. value
Wanship, UT

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

Parks and Open Spaces Master Valves and Flow Meters
Results
Clearfield, UT 84015

Reported 07/08/2022 12:00 AM
Project Title

Central Park Well Equipping

Physical Address View project details and contacts
City, State (County) Smithfield, UT   (Cache County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a new CMU well house and new piping and appurtenances, electrical, heating, air conditioning system, installing security fence, coordinating with SCADA provider, backup generator and automatic transfer switch. Installing a new waterline from the well house and connecting to an existing waterline is also included. The Project has an expected duration of 300 days. Select "Plans" tab at top of page Bidding Documents may be downloaded from the designated website. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Bids will only be accepted from registered plan holders who have downloaded a set. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents