Similar Projects
Last Updated | 09/27/2021 01:23 AM |
Project Title | Clearing and Grubbing, Erosion Control, Resurfacing and Shoulder Grading |
Physical Address | View project details and contacts |
City, State (County) | (Hoke, Moore Counties) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Landscaping/Irrigation, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Nc – 211 From Us – 15/Us – 501 To Sr – 1244/Sr – 1311. Mobilization Lump Sum Ls Construction Surveying Lump Sum Ls Clearing & Grubbing .. Acre(s) 5 Acr Supplementary Clearing & Grubbing 17,500 Sy Geotextile For Soil Stabilization 1.2 Smi Shoulder Reconstruction 203 Ton Aggregate Shoulder Borrow 400 Sy Incidental Milling 650 Ton Asphalt Conc Surface Course, Type s9.5b 45 Ton Asphalt Binder For Plant Mix 5,850 Sy Geotextile For Drainage Lump Sum Ls Generic Traffic Control Item Traffic Control 12,100 Lf Thermoplastic Pavement Marking Lines (4", 90 Mils) 4 Ea Thermoplastic Pavement Marking Character (90 Mils) 86 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (16", 90 Mils) 66 Lf Generic Pavement Marking Item Thermoplastic Pavement Marking Lines (24", 90 Mils) 38 Ea Permanent Raised Pavement Markers 350,000 Lf Temporary Silt Fence 3,500 Ton Stone For Erosion Control, Class a 27,800 Ton Stone For Erosion Control, Class b 13,200 Ton Sediment Control Stone 1,138 Acr Temporary Mulching 43,900 Lb Seed For Temporary Seeding 221 Ton Fertilizer For Temporary Seeding 200 Lf Safety Fence 180,100 Cy Silt Excavation 253,220 Sy Matting For Erosion Control 1,850 Sy Coir Fiber Mat 25,300 Lf 1/4" Hardware Cloth 1,100 Lf **" Temporary Pipe (15") 575 Lf **" Temporary Pipe (18") 350 Lf **" Temporary Pipe (24") 100 Lf **" Temporary Pipe (30") 50 Lf **" Temporary Pipe (36") 125 Lf **" Temporary Pipe (42") 40 Lf **" Temporary Pipe (54") 2 Ea Special Stilling Basins 18,600 Lf Coir Fiber Wattle 650 Lf Wattle Barrier 19,125 Lb Polyacrylamide (Pam) 31,000 Lf Coir Fiber Baffle 71 Ea **" Skimmer (1-1/2") 30 Ea **" Skimmer (2") 13 Ea **" Skimmer (2-1/2") 5 Ea **" Skimmer (3") 4 Ea **" Skimmer (4") 650 Acr Seeding & Mulching 500 Acr Mowing 11,500 Lb Seed For Repair Seeding 32 Ton Fertilizer For Repair Seeding 16,075 Lb Seed For Supplemental Seeding 485 Ton Fertilizer Topdressing 10 Mhr Specialized Hand Mowing 150 Ea Response For Erosion Control 88 Ea Generic Erosion Control Item Sign Lump Sum Ls Generic Erosion Control Item Removal Of Japanese Knotweed 880 Lf Generic Erosion Control Item Safety Fence For Monitoring Well Protection Lump Sum Ls Asbestos Assessment |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |