Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Z--Romo HQE Waterline Rehab Phase 7 & 8
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Estes Park, CO

Enclave at Redwood
New Construction, Infrastructure
Design
$91,000,000 est. value
Fort Collins, CO

Contractor - 24 Inch Waterline Reroute Project
Infrastructure
Bidding
$300,000 est. value
Fort Collins, CO

Solid Waste Diversion Facilities and Emerging Technologies - P3 opportunities
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Fort Collins, CO 80521

190815A/Mountain Campus Modular Faculty Cabins
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Bellvue, CO 80512

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Construction of the Kinston Welcome Center
Post-Bid
Loveland, CO

Copper Ridge Connector Trail
Results
Loveland, CO

CM/GC Services for the 2020 Alley Program - Tenney Court North and West Oak Alleys
Renovation
Results
Fort Collins, CO 80522

Berthoud Commons
New Construction
Construction
Berthoud, CO 80513

Thompson River Ranch Clubhouse - Phase I Site Improvements
Infrastructure
Construction
Johnstown, CO 80534

Outdoor Vehicle Storage
New Construction
Pending Verification
Fort Collins, CO 80524

Balfour Senior Living Development
New Construction, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Fort Collins, CO 80528

Hughes Stadium Subdivision
New Construction, Infrastructure
Design
$274,000,000 CJ est. value
Fort Collins, CO 80524

Last Updated 08/05/2022 06:02 PM
Project Title

Kinston Regional Pond 1 Public Infrastructure Project

Physical Address View project details and contacts
City, State (County) Loveland, CO 80538   (Larimer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The projects generally include overlot grading, erosion control, storm sewer, concrete sidewalk, and all related work incidental to the completion of the project as per the acceptance requirements of Kinston Metropolitan District No. 1 and City of Loveland. The project is located in the vicinity of Kinston Parkway and Centerra Parkway in Loveland, CO. Work is anticipated to start October 1, 2022. A bid bond in the amount of five percent (5%) of the total bid is required with each bid. Performance and payment bonds will be required of the successful bidder from a qualified surety. Bidders must possess the required licenses and insurance policies. Each bid must be accompanied by a qualification statement demonstrating present commitments, past performance, experience with comparable work, equipment available for this project, and resumes for key personnel who would be assigned to this project. No bid will be accepted from any firm, person, or corporation who is a defaulter to a surety or is deemed incompetent, irresponsible, or unreliable by the District. Each bid must be accompanied by a subcontractor and supplier list for proposed labor, services, and/or materials. Bidding contractors must self-perform a minimum of fifty percent (50%) of the work. The District may choose to schedule interviews with select bidders following the bid opening. Basis of the award of the contract will be to the lowest responsible and responsive bidder as solely determined by the District. The District reserves the right to reject any and all bids or to accept any bid or combination of bids which in its sole and absolute judgment will best serve the District's interest

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents