Similar Projects
Kirkwood Grove
New Construction
Conception
Hudson, NC 28638

Brooklyn Village Redevelopment
New Construction - 2,321,500 SF
Conception
$683,300,000 est. value
Charlotte, NC 28202

Crescent Pointe at Greenhaven
New Construction - 72,035 SF
Design
Lenoir, NC 28645

3402 Hillsborough
New Construction - 71,000 SF
Design
Raleigh, NC 27607

The Park Seniors
New Construction
Sub-Bidding
Charlotte, NC 28216

300 and 500 East Main Development
Post-Bid
Durham, NC

Dawson Street Lofts
New Construction
Results
Less than $3,480,160 est. value
Wilmington, NC 28401

Community Building for the Tylertown Area
- 1,800 SF
Results
NC 28376

Carroll at Bellemeade
New Construction - 256,282 SF
Construction
$50,000,000 est. value
Greensboro, NC 27401

Pier 33
New Construction - 510,113 SF
Construction
$65,000,000 est. value
Wilmington, NC 28401

Heritage Woods
New Construction
Conception
Taylorsville, NC 28681

Vermillion Village
New Construction - 10,000 SF
Design
Huntersville, NC 28078

The Edge
New Construction
Construction
Charlotte, NC 28209

Cedar Pointe
New Construction
Conception
Asheboro, NC 27205

Woodridge Village
Renovation
Design
Mount Olive, NC

Last Updated 03/01/2021 12:58 PM
Project Title

Stockton Pointe

Physical Address View project details and contacts
City, State (County) Kinston, NC   (Lenoir County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced fourth quarter 2019, Construction Complete as of fourth quarter 2020
Bids Due View project details and contacts
Estimated Value $4,789,135
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, New Construction 60 Unit(s), 1 Clubhouse/Social Club, 1 Story Above Grade, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents