Similar Projects
Underground Storage Tanks Removal and Replacement
Bidding
Southgate, MI

1,500 Gall Fuel Dispenser
Post-Bid
Gwinn, MI

Dye Sodium Hypochlorite Tank Procurement
Post-Bid
Lansing, MI

SAR Ken`S Party Store - UST Removal
Results
Harrison, MI

Waste Oil Removal
Term Contract
Results
Detroit, MI

BP 5 Transportation Access Road and Fuel Tank
Post-Bid
Southfield, MI

Fuel Facility Relocation and Expansion
Results
Less than $591,000 est. value
Hillsdale, MI

Fuel Pump Repairs
Post-Bid
Dearborn, MI

Chemical Pumps
Results
Less than $86,931 est. value
Detroit, MI

2020 Wastewater Treatment Plant Bulk Chemicals
Post-Bid
Ypsilanti, MI

Fuel Dispensing System at the Educational Service Center
Results
Less than $905,362 est. value
Clinton Township, MI

Propane & Tanks
Post-Bid
Wayne, MI

Fuel Tank Replacement Project
Results
Ann Arbor, MI

2019 Bond Fuel Tank Replacement Project
Post-Bid
Whittemore, MI 48770

Sault Tribe Housing Authority - Odenaang Natural Gas Conversion
Results
Less than $64,885 est. value
Sault Sainte Marie, MI

Reported 03/31/2020 12:00 AM
Project Title

FY20 Sault Magazine Feeder 4 Repair

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49783   (Chippewa County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers Detroit District is conducting this Sources Sought in support of Market Research to notify and seek potential qualified members of industry to gain knowledge of capabilities, interest, and qualification; to include the Small Business Community, for the removal and replacement of approximately 1,200 lineal feet of 15kV 500 kcmil Compact Sector, Paper Insulated Lead Covered (PILC) low pressure nitrogen filled cable. The cable is located between Manhole 13 and the Magazine Street Substation in an underground duct bank. A replacement cable shall be installed in the existing duct back and shall be rated 15kV URD and be of 500 kcmil copper. Splice kits shall be provided to connect the existing cable to the newly installed cable. Cable termination and testing from the Magazine substation to the North Power Plant will be conducted.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents