Similar Projects
Reported | 03/31/2020 12:00 AM |
Project Title | FY20 Sault Magazine Feeder 4 Repair |
Physical Address | View project details and contacts |
City, State (County) | Sault Sainte Marie, MI 49783 (Chippewa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Corps of Engineers Detroit District is conducting this Sources Sought in support of Market Research to notify and seek potential qualified members of industry to gain knowledge of capabilities, interest, and qualification; to include the Small Business Community, for the removal and replacement of approximately 1,200 lineal feet of 15kV 500 kcmil Compact Sector, Paper Insulated Lead Covered (PILC) low pressure nitrogen filled cable. The cable is located between Manhole 13 and the Magazine Street Substation in an underground duct bank. A replacement cable shall be installed in the existing duct back and shall be rated 15kV URD and be of 500 kcmil copper. Splice kits shall be provided to connect the existing cable to the newly installed cable. Cable termination and testing from the Magazine substation to the North Power Plant will be conducted. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |