Similar Projects
Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

Guntersville High School - Guntersville City Education Board
Addition, Demolition, Infrastructure
Design
$45,000,000 CJ est. value
Guntersville, AL 35976

US Highway 231 Water Line Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Blountsville, AL 35031

US Highway 231 Water Line Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Blountsville, AL 35031

Meter Boxes and Lids for the Madison County Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

2021 Water Main Rehabilitations and Extensions
Post-Bid
Alabaster, AL

New Benjamin Russel High School Package A - Sitework
Results
Alexander City, AL 35010

2020 Neighborhood Improvements
Results
Haleyville, AL 35565

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Abandonment of Water Supply Well No. 4
Infrastructure
Construction
$50,000 CJ est. value
Enterprise, AL 36330

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

Blackridge South Phase 1
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hoover, AL 35080

Pines At Holladay Apartments
New Construction, Infrastructure
Conception
$135,000,000 CJ est. value
Huntsville, AL 35801

Last Updated 09/27/2022 07:34 AM
Project Title

2021 CDBG Water Main Improvements

Physical Address View project details and contacts
City, State (County) Alexander City, AL 35010   (Tallapoosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2021 CDBG Water Main Improvements The bid is comprised of the following principal items and approximate quantities: 4,500 +- LF of 6" HDPE Water Main Installed by Horizontal Directional Drilling Miscellaneous Appurtenances and Work This project is considered a "Public Works" project and is governed by competitive bid laws as contained in Title 39 of the Alabama Code. Bidders, subcontractors, suppliers, and Bond Agents should be familiar with this code. This project is also governed by CDBG requirements and SRF Requirements. The Owner reserves the right to reject any or all proposals and to waive technicalities. No Bidder may withdraw his bid within sixty days from the date set for receiving of the same. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within ten (10) calendar days after the date of the NOTICE TO PROCEED and will complete the same within 270 calendar days unless the period for completion is I extended otherwise by the CONTRACT DOCUMENTS. The Contractor further agrees to pay, as liquidated damages, the sum of $1,000 for each consecutive calendar day thereafter as hereinafter provided in the GENERAL CONDITIONS and SPECIAL PROVISIONS

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents