Similar Projects
River Bottom Improvement Project Prequalification
Post-Bid

200 South Waterline Project
Post-Bid
Marriott-Slaterville, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Milford City Water Improvement Project
Results
Less than $5,000,000 est. value

Construction of the Valley Elementary Well Equipping
Post-Bid
$50,000 est. value
Eden, UT 84310

1700 West Sewer and Water Project
Results
Less than $230,000 est. value
Roy, UT 84067

1975 North Waterline Project
Post-Bid
$500,000 est. value
Plain City, UT

Porter Rockwell Boulevard Segments 4 & 5 Water Line and Street Lighting
Results
Less than $1,419,075 est. value

Prevedel Park Phase 1
Infrastructure
Post-Bid
West Haven, UT

1900 North Waterline Project
Results
Less than $66,500 est. value
Plain City, UT

Culinary Water Improvement Project on 5050 South from 1150 West to Golden Spike Park
Infrastructure
Post-Bid
$213,500 est. value
Riverdale, UT 84405

700 North Waterline Project
Results
Less than $158,500 est. value
Harrisville, UT

Pleasant View Water Transfers and Storm Drain Spot Repairs
Infrastructure
Post-Bid
Pleasant View, UT

Harrisville Heights Waterline Project
Results
Less than $117,000 est. value
Harrisville, UT

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

Last Updated 05/29/2022 11:47 PM
Project Title

Pump House 5 and Top of Mountain Water System Project

Physical Address View project details and contacts
City, State (County) Eden, UT 84310   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, tools, materials, equipment, transportation and services required for building improvements for new pump house to be constructed, attached to, an existing culinary water pump house at the above-described location, in Weber County Utah. BASE WORK consists of the following items of work: mobilization, traffic control, and erosion control; clearing and grubbing work areas; all required general earthwork, including general excavating, backfilling, construction of embankments, grading, and compacting; furnishing, placing and compacting sub-base fill material; furnishing and placing borrow material for embankments and fill; constructing new wood frame building for new pumphouse on new concrete foundation, including all required earthwork, concrete work, metal door & frame, carpentry work, insulation, metal roof system and trim, with; plumbing system (pump, piping, and controls), electric unit heaters, and electrical system supplied and installed by others; standby generator supplied and installed by others; connecting new 10-inch pump supply pipe to existing 16-inch pipe line; furnishing and installing new 10-inch water line connection to existing waterline; furnishing, placing and compacting new gravel surfaces; placing and compacting new surfaces; furnishing, including gravel road base; furnishing and installing new PRV station; and all appurtenant work;

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents