Similar Projects
Clinton Agricultural Associates
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Lebanon, NJ 08833

RFP - Development of Affordable Housing on Block 5, Lots 2 and 3
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Pittstown, NJ 08867

Water System Improvements For Phylis Lane William Street and York Road Borough of Milford Water Department
Infrastructure
Bidding
$500,000 CJ est. value
Milford, NJ 08848

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Resurfacing Project for: Rittenhouse Circle, Ivy Court and Overlook Court
Infrastructure
Post-Bid
$100,000 est. value
Raritan Township, NJ 08822

Roadway Improvement Project for Devonshire Court, Plymouth Court & South Hampton Court
Infrastructure
Results
Raritan Township, NJ 08822

Downtown Streets Improvement Project
Infrastructure
Results
Frenchtown, NJ 08825

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Roadway Improvement Project On Phylis Lane & Williams Street
Infrastructure
Bidding
$800,000 CJ est. value
Milford, NJ 08848

2021 Grant Avenue and Allen Street Improvements Project
Infrastructure
Post-Bid
$300,000 est. value
Lambertville, NJ

Maintenance Roadway Contract C216
Infrastructure
Results
$10,000,001 to $20,000,000 est. value

New Vocational Building - Hunterdon County Vocational School District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Clinton Township, NJ 08801

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

River Road Improvement Project - Section II
Infrastructure
Results
High Bridge, NJ

Last Updated 06/23/2023 08:32 AM
Project Title

Nature Trail Renovation and Construction Phase 1

Physical Address View project details and contacts
City, State (County) Lambertville, NJ 08530   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $86,596 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 23, 2023, this project has not yet been awarded. The project is expected to be awarded on July 20, 2023.** Any questions must be submitted to the Lambertville City Clerk via email at cityclerk@lambertvillenj.org or by mail at 18 York Street, Lambertville, New Jersey 08530 and received no later than noon on April 13, 2023. Questions and their responses will be posted on the Lambertville City website along with the RFP. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1 et seq. The City of Lambertville owns wooded hillside properties rising above Ely Park east of Main Street, extending from Phillips Barber Road at the north end south to York Street. An existing hiking trail, known as the Lambertville Nature Trail, runs north to south in this area. The trailhead is on Alexander Road in Lambertville. The purpose of this project is to make improvements where necessary to the existing trail, and to expand the trail system. This project proposes to construct one new bridge, repair all eroded portions of the existing trail, and construct new trails totaling 4,923 linear feet to expand the existing trail system. Refer to Figure 1 below for details. The goal of the nature trail construction project is to create a sustainable hiking trail that is optimized for use by walkers, hikers and trail runners of most skill and ability levels. The trail shall be constructed to meet the U.S. Department of Agriculture Forest Service (USFS) requirements for a Standard Terra Trail; Trail Class 3, Developed; Hiker/Pedestrian Managed and Design Uses, with these modifications: Native materials should be used as much as possible, and there should be no or minimal clearing of vegetation outside trailway. The only structure anticipated is the new bridge mentioned above. The majority of users are anticipated to be of beginner and intermediate skill levels; therefore the final layout and construction shall be considerate of those ability levels.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents