Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Aurora City - Culinary Water Improvements 2021
Infrastructure
Bidding
$1,750,000 est. value
Aurora, UT 84620

Granular Activated Carbon(Gac) Change- Out for The Industrial Waste Treatment Plant
Term Contract
Bidding
Hill AFB, UT

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

Lower and Upper Spring Creek Tanks Rehabilitation Project
Results
$150,000 to $200,000 est. value
Springville, UT 84663

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Design/Build Elevated Water Tank Aneth
Results
$100,000 to $250,000 est. value
Aneth, UT 84510

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Enoch City Tank and Booster Project
Results
Less than $110,000 est. value
Enoch, UT 84721

Zone 2 and 3 Tanks Project
Post-Bid
Herriman, UT 84096

Concrete Storage Tanks Water Improvements Project
Results
Less than $3,500,000 est. value
Kanab, UT 84741

Reported 09/09/2021 12:00 AM
Project Title

Panguitch City Water Tank Lid Replacement Project

Physical Address View project details and contacts
City, State (County) Panguitch, UT 84759   (Garfield County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of the following: Removal and disposal of concrete water tank lid, internal columns and access ladder; remove and protect access hatch; furnishing and installing concrete reinforcements, internal concrete columns, concrete lid, reinstalling access hatch and ladder. This project also involves extending the tank inlet pipe, installing new control valve and meter vaults. Project is located at the existing tank site in Panguitch, Utah. Off of 300 South, west of Industrial Park Road.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents