Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Telegraph Tower
New Construction - 905,000 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94612

Platform 16 Office Complex
New Construction - 1,125,000 SF
Design
$10,000,000 CJ est. value
San Jose, CA

East Brokaw Road Development
New Construction - 39,100 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
San Jose, CA 95154

Addition and Remodel of The Midway City Sanitary District Office
Renovation, Addition, Demolition - 12,740 SF
Bidding
$4,600,000 est. value
Westminster, CA 92683

Office TI
Build-Out
Post-Bid
San Jose, CA 95131

Fedex #1020
Renovation - 8,332 SF
Post-Bid
Los Angeles, Torrance, CA 90505

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Results
$54,700,000 est. value
San Jose, CA 95135

As Needed Maintenance and Repair Services
Renovation
Results
Calexico, El Centro, CA 92231

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

30 Van Ness
New Construction - 824,000 SF
Construction
$244,000,000 est. value
San Francisco, CA 94102

East Brokaw Road Office Development
New Construction - 14,858,000 SF
Pending Verification
$10,000,000 CJ est. value
San Jose, CA 95112

Seward Office Building
New Construction
Pending Verification
Los Angeles, CA 90038

Times Mirror Square DTLA Mixed Use Development
New Construction, Renovation
Conception
Los Angeles, CA 90012

Last Updated 06/28/2022 02:31 PM
Project Title

Corporation Yard Improvements - City of Eureka

Physical Address View project details and contacts
City, State (County) Eureka, CA 95501   (Humboldt County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $982,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in Eureka, California. Conceptual plans call for the construction of a municipal facility; for site work for a municipal facility; warehouse / distribution facility; and warehouse / distribution facility. Planning and construction of new office space, break/locker room and additional storage to replace failing facilities. As of June 27, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Office, New Construction, Industrial Warehouse, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents