Similar Projects
Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

SPC Stem Center Living Shoreline
Results
Less than $100,000 est. value
Saint Petersburg, FL 33733

Lakeview Road ADA Ramps and Drainage Improvements
Results
Less than $1,572,017 est. value
Clearwater, FL 33756

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Seawall Maintenance, Repair and Related Services
Results
Less than $900,000 est. value
Saint Petersburg, FL 33731

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lakeshore Estates Phase 2 Roadway and Drainage Improvements (PID #001177B)
Results
Less than $4,252,484 est. value
Clearwater, FL 33756

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Improvements for Seventh, and Eighth Street - BMP 5
Results
$240,605 to $298,766 est. value
Belleair Beach, FL 33786

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

2021 Seawall and Stormwater Improvements-Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL

Creek Shoreline Restoration
Results
Less than $600,000 est. value
Saint Petersburg, FL 33711

FY 2022-2024 Countywide ADA, Sidewalk, Drainage, Roadway Improvements
Infrastructure
Post-Bid
$19,000,000 est. value
FL

Last Updated 11/30/2021 01:05 PM
Project Title

Channel 1C Upgrade - from 98th Avenue to Confluence of Channel 1 Contract Nos. 1, 2, and 3

Physical Address View project details and contacts
City, State (County) Pinellas Park, FL 33782   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 (Channel 1 to STA 7+50) Mobilization/demobilization, soil erosion and sedimentation control measures, demolition, clearing and grubbing, re-grade the eastern and western channel banks to match the existing concrete panels at both the southern and northern project extents, transitioning to the existing concrete panels directly north of Channel 1; transitioning to the existing headwall at the northern end of the project (just south of 90th Avenue N); install reinforced concrete channel lining with concrete bottom; relocate existing utilities as required by the proposed design; tree removal; tree replacement; and perform general site work associated with the improvements listed above, and all related work for a complete and operable system. All Work shall be done as described in the Contract Documents and as shown on the Drawings complete and ready for operation. Contract No. 2 (STA 7+50 to STA 21+00) Mobilization/demobilization, soil erosion and sedimentation control measures, demolition, clearing and grubbing, re-grade the eastern and western channel banks to match the existing concrete panels at both the southern and northern project extents, transitioning to the existing concrete headwall directly north of 90th Avenue N; transitioning to the existing concrete headwall directly south of 94th Avenue N; install reinforced concrete channel lining with concrete bottom; relocate existing utilities as required by the proposed design; tree removal; tree replacement; and perform general site work associated with the improvements listed above, and all related work for a complete and operable system. All Work shall be done as described in the Contract Documents and as shown on the Drawings complete and ready for operation. Contract No. 3 (STA 21+00 to STA 34+00) Mobilization/demobilization, soil erosion and sedimentation control measures, demolition, clearing and grubbing, re-grade the eastern and western channel banks to match the existing concrete panels at both the southern and northern project extents, transitioning to the existing concrete headwall directly north of 94th Avenue N; transitioning to the existing concrete headwall directly south of 98th Avenue N; install reinforced concrete channel lining with concrete bottom; relocate existing utilities as required by the proposed design; tree removal; tree replacement; and perform general site work associated with the improvements listed above, and all related work for a complete and operable system. All Work shall be done as described in the Contract Documents and as shown on the Drawings complete and ready for operation.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents