Similar Projects
Fencing Services
Term Contract
Bidding
Yuma, AZ

Housing 7 Fencing Design Project
Alteration
Bidding
Tucson, AZ 85705

Job Order Contracting (JOC) for Fencing
Post-Bid
Kingman, AZ 86401

Gate Installation Services
Post-Bid
Phoenix, AZ 85003

Y--Sawmill Fire, Range Fence Replacement
Results
Tucson, AZ 85756

Cook`s Lake Operation and Maintenance
Results
Glendale, AZ

Route N71-Birdsprings
Post-Bid
Window Rock, AZ 86515

Job Order Contractor For Parks And Recreation
Results
Less than $5,000,000 est. value
AZ

Meadow Fence Construction Project
Post-Bid
Show Low, AZ

ACDC Fence Improvement Project 25th Avenue - 7th Avenue and Cave Creek Arm
Results
AZ

Fencing for the Cornfield Chapter Community Cemetery
Post-Bid
Ganado, AZ

Fencing Materials and Installation
Term Contract
Results
Tucson, AZ 85705

Tuba City Outpatient Treatment Center Motorized Gate Project
Post-Bid
Tuba City, AZ 86045

Softball - Backstop
Results
Tuba City, AZ 86045

AZC ADOT E0S2H Construct Wildlife Deterrent Fence
Post-Bid
Less than $567,500 est. value
Colorado City, AZ

Last Updated 10/18/2021 12:32 PM
Project Title

Baer Gates Project - Bush & Central Fires

Physical Address View project details and contacts
City, State (County) Phoenix, Rio Verde, AZ 85263   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Gate installs. The project encompasses several different access points to burn areas for the Bush and Central fires. The six gates will be installed on the Tonto Basin, Mesa and Cave Creek Ranger Districts within the Tonto National Forest. The gates will provide the Forest the ability to safely close off a burned area from the public during BAER restoration activities and during the natural recovery of the burned area. All work shall be completed in accordance with the project specifications and drawings. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified. All gates shall be installed per manufacturer's recommendations.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents