Similar Projects
Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

Horticulture Farm Agroforestry Education & Research Center New Building Shell
New Construction - 4,920 SF
Design
$535,000 est. value
Columbia, MO

Medical Science Building Morgue Facility Update
Renovation - 2,600 SF
Design
$581,307 est. value
Columbia, MO

Replace Utility Lines East of Memorial Student Union
Infrastructure
Bidding
$1,418,048 CJ est. value
Columbia, MO 65201

Pedestrian Bridge and Walkway at Flat Branch Park
Infrastructure
Bidding
$200,000 CJ est. value
Columbia, MO 65203

Hospital and Clinics Various Locations
Renovation
Post-Bid
Less than $5,000,000 est. value
Columbia, MO

Building Demolition for Strategic Space Reduction
Demolition
Post-Bid
$7,000,000 to $9,000,000 est. value
Columbia, MO 65211

University of Missouri Teaching Hospital-CT Replacement, 2E07
New Construction
Results
$360,000 to $400,000 est. value
Columbia, MO 65201

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Memorial Student Union Restroom Renovation S111 & S113
Renovation
Construction
$160,500 est. value
Columbia, MO

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Brushwood Lake Road Loop Closure - E0185 - 1602 - City of Columbia
Infrastructure
Conception
$750,000 CJ est. value
Columbia, MO 65203

MURR Reactor Building West Building Addition
Addition - 43,000 SF
Design
Columbia, MO

Last Updated 03/22/2023 01:09 AM
Project Title

NextGen Precision Health Building - Level 4 - Shell Space Fitout

Physical Address View project details and contacts
City, State (County) Columbia, MO 65212   (Boone County)
Category(s) Education, Heavy and Highway, Laboratory
Sub-Category(s) College/University, Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,817,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The curators also approved fitting out the fourth floor of the Roy Blunt NextGen Precision Health Building at MU with 18,200 square feet of additional research laboratory space. Construction Estimate: $11,061,324 - $12,290,360 Questions regarding the scope of work should be directed to Gerilyn Ornce with Burns & McDonnell Engineering Company, Inc. at (816) 782-6626 or ggornce@burnsmcd.com. Questions regarding commercial conditions should be directed to Jody Miller at (573) 884-8912 or jrmiller@missouri.edu. A Diversity Participation goal of 10% MBE, 10% Combined WBE, DBE, Veteran Owned Business and 3% SDVE has been established for this contract. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Individuals with special needs as addressed by the Americans with Disabilities Act may contact (573) 882- 1133. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

18,200 SF. 1 Story Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents