Similar Projects
Heating, Ventilation and Air Conditioning Services
Term Contract
Sub-Bidding
Irvine, CA 92606

RFQ Contractor - Air Handler Replacements 2023
Renovation
Sub-Bidding
$8,000,000 CJ est. value
Irvine, CA 92606

Pollak Library South HVAC Duct Cleaning
Alteration
Post-Bid
Fullerton, CA 92831

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Fullerton DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Fullerton, CA 92832

Golden West College LRC Duct Work Replacement
Renovation, Alteration
Results
$400,000 est. value
Huntington Beach, CA 92647

Heating, Ventilation and Air-Conditioning (HVAC) Preventative Maintenance and Repair Services
Alteration
Results
CA

Boiler Maintenance and Repair
Term Contract
Sub-Bidding
Santa Ana, CA 92703

Police Headquarters Lobby Roof and HVAC Rehabilitation
Term Contract
Post-Bid
Orange, CA 92867

Various Facilities HVAC Replacement
Alteration
Results
$138,000 est. value
Costa Mesa, CA 92626

Removal and Replacement of two (2) Carrier or Equivalent 10-ton Units on the Huntington Beach Building
Renovation
Sub-Bidding
$50,000 CJ est. value
Huntington Beach, CA 92648

Heating, Ventilation, Air Conditioning and Refrigeration Parts and Equipment
Term Contract
Post-Bid
Tustin, CA

Anaheim West Tower HVAC Rehabilitation and Related Work
Term Contract
Results
$6,000,000 est. value
Anaheim, CA 92805

Districtwide HVAC Replacement LLB
Renovation
Sub-Bidding
$1,400,000 CJ est. value
Anaheim, CA 92801

Eastbluff HVAC Replacement
Alteration
Post-Bid
$1,900,000 est. value
Newport Beach, CA 92660

Heating Ventilation and Air Conditioning Related Services
Term Contract, Alteration
Results
Stanton, CA 80680

Last Updated 02/20/2023 11:08 AM
Project Title

Fullerton Union High School Classroom HVAC Replacement

Physical Address View project details and contacts
City, State (County) Fullerton, CA 92833   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $820,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid must conform and be responsive to all pertinent Project Documents, including, but not limited to, the Information for Bidders. Engineer's Estimate: $1,140,000.00 As security for its Bid, each bidder shall provide with its Bid form either (1) a bid bond issued by an admitted surety insurer on the form provided by the District, (2) cash, or (3) a cashier's check or a certified check, drawn to the order of the District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within the time frame required in the Project Documents, enter into the contract to perform the Project. The successful Bidder shall be required to furnish a 100 % Performance Bond and a 100% Payment Bond if it is awarded the contract to perform the Project. This is a public works project. The successful bidder and all of its subcontractors of all tiers shall register with the Department of Industrial Relations (DIR) as a contractor that is working on a public works project and shall pay all workers on all work on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the DIR, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code (other than the companies that manufacture and deliver ready mixed concrete directly to construction sites using their own drivers, pending the final adjudication of Allied Concrete & Supply Co., v Edmund Gerald Brown J., et al., United States District Court, Central District of California, Case No. 2.16CV04830RGK (FFM)**). Prevailing wage rates are available from the District or on the Internet No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a) in which circumstance the contractor or subcontractor is ineligible to respond to a bid or to do public work]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015). This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Fullerton Joint Union High School District ("District") has determined that the following contractors and subcontractors must be prequalified prior to submitting a bid or proposal on the " Fullerton Union High School Classroom HVAC Replacement" ("Project"): . All Prime contractors and subcontractors holding the following licenses must be prequalified with the District regardless of the value of the contract: . C20 These contractors and subcontractors must submit an original fully completed and sealed Prequalification Questionnaire to the District at the time/date/location indicated here: Facilities and Construction Department, Fullerton Joint Union High School District, 1027 S. Leslie St, La Habra, CA 90631 Time: January 9, 2023 by 3:00 PM Any contractor that has prequalified on a District project within the past twelve (12) months may be able to satisfy the prequalification requirements for this project. Please review the Prequalification Questionnaire in the Project Documents for this Project to make that determination. The District requires that each bidder possess the following classification(s) of contractor's license(s) at the time the bid is submitted : Bid No. Description License 04120932 FUHS Classroom HVAC Replacement C20 The Bidder's license(s) must remain active and in good standing at the time of the bid opening and throughout the term of the Agreement. The Project Documents are on file at the following location: Crisp Imaging . The Project Documents include the plans and specifications pursuant to which the Project is to be constructed and upon which the bidders are to base their bids. All inquiries about the project are to be directed to Dale McCurry, dmccurry@fjuhsd.org The District's Board has found and determined that specific item(s) shall be used on this Project based on the purpose(s) indicated in Public Contract Code section 3400(c). A full list of those items are attached to the Project Documents and can be found at Facilities and Construction / District Standards Pursuant to Public Contract Code section 22300, the Agreement will contain provisions permitting the successful bidder to substitute securities for any monies withheld by the District to ensure performance under the Agreement or permitting payment of retentions earned directly into escrow. The District shall award the Agreement, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount only. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. Prior to the Bid Submission Deadline, any bidder may withdraw its bid in person or by written request. No bids may be withdrawn between the Bid Submission Deadline and the ninetieth (90 th calendar day thereafter, inclusive, and all bids shall be effective throughout that entire ninety (90) day period.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents