Similar Projects
Hayes Elementary School Construction
New Construction
Conception
Ada, OK

Anderson Building at Ponca High School STEM Space
New Construction
Conception
Ponca City, OK 74601

Washington School Replacement - 2021 Bond - Ada City School District
New Construction
Design
$37,000,000 est. value
Ada, OK

New Performing Arts & College Career Center
New Construction
Design
$59,360,000 est. value
Yukon, OK

Athletic Lighting Improvements
Infrastructure, Renovation
Bidding
$250,000 CJ est. value
Beggs, OK 74421

High School and Elementary School Renovation Burns Flat Dill City Public School
Renovation
Bidding
$450,000 CJ est. value
Burns Flat, OK 73647

Restroom Remodel Specialties and Plumbing
Build-out
Sub-Bidding
Okmulgee, OK 74447

Restroom Remodel Specialties and Plumbing
Build-out
Sub-Bidding
Okmulgee, OK 74447

Memorial HS Entry and Classroom Addition Project
Addition
Post-Bid
Edmond, OK 73013

Twin Hills Schools Cafeteria Addition
Addition
Post-Bid
Okmulgee, OK 74447

Kiamichi Tech Shop Remodel and Finish Updates
Renovation
Results
Idabel, OK 74745

Weatherford New Concessions and Locker Room Building
New Construction
Results
Weatherford, OK 73096

Elementary Interior Improvements Project
Renovation
Construction
Wilson, OK 73463

St. Mary's Episcopal School
Addition
Construction
Edmond, OK 73034

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

Last Updated 08/25/2022 02:11 PM
Project Title

Denison School Safe Building

Physical Address View project details and contacts
City, State (County) Idabel, OK 74745   (McCurtain County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

One paper set of Construction Documents will be made available to all qualified General Contractor's for which a one hundred dollar ($100.00), refundable deposit will be required. Cost for additional copies will not be refundable. Electronic (CD) copies are available for fifty dollars ($50.00), each; non-refundable. Electronic Documents can be downloaded at no cost. Refundable deposits will be returned in full if the Construction Documents are returned to the Architect, in good condition, within seven (7) days of the time set for opening bids. The Architect will provide document distribution. Construction Documents can be requested by contacting the Architect at: jim@newcombae.com. Each Bidder shall submit their Proposal in a sealed envelope. Enclosed with their Proposal shall be executed copies of the Non-Collusion and Business Relationship Affidavits as well as other documents required in the Construction Documents. All bids not in compliance with the Construction Documents will be rejected. Each Bidder shall submit, with the Proposal, a Bidder's Bond as required in the State School Laws of Oklahoma and these Construction Documents. Such Bonds may be in the form of an irrevocable letter of credit, cashier's check or bid bond. Cash is not acceptable. All such bonds shall be made payable to the Owner in an amount no less than five (5%) percent of the largest combination of the Base Proposal and any Alternates. The Contractor may be required to forfeit the Bid Bond, to the Owner, in the event the Contractor fails to execute a Contract or fails to provide the required Bonding and Insurances. Upon the Owner's acceptance of bids, a Contract will be executed between the Owner and the approved Bidder. All bonding and insurance will be attached to the executed Contract. Bids may not be withdrawn for a period of thirty (30) calendar days after the date of this Bid Opening. The Owner reserves the right to reject any or all Bids and waive any informality or irregularity in any Bids received.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents