Similar Projects
New Fuel Farm Facility - City of Lees Summit
Renovation
Conception
$1,880,000 CJ est. value
Lees Summit, MO 64064

Airport - Perimeter Fencing - WP2125 - City of West Plains
Renovation
Conception
$1,500,000 CJ est. value
West Plains, MO 65775

Aircraft Rescue Fire Fighting (ARFF) & Snow Removal Equipment(SRE) Facility - REBID
Renovation
Bidding
$7,000,000 CJ est. value
Webb City, MO 64870

Aircraft Rescue Fire Fighting (ARFF) and Snow Removal Equipment(SRE) Facility Development
New Construction, Infrastructure
Bidding
$515,000 CJ est. value
Webb City, MO 64870

ADA Ramp Addition
Addition
Post-Bid
Joplin, MO 64801

RFP D/B - New Passenger Terminal Building at the Cape Girardeau Regional Airport
New Construction, Infrastructure - 20,000 SF
Post-Bid
$12,000,000 CJ est. value
Cape Girardeau, MO 63701

Runway 35 MALSR Installation - 413100 - City of St.Joseph
Renovation
Pending Verification
$3,000,000 est. value
Saint Joseph, MO 64504

New Passenger Terminal Phase 2 - Waynesville - St. Robert Regional Airport
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Fort Leonard Wood, MO 65473

Airport Terminal Building - City of Kirksville
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Kirksville, MO 63501

Cape Girardeau, MO - Airport Terminal Roof Replacement
Renovation
Bidding
$1,000,000 CJ est. value
Cape Girardeau, MO 63701

KCPD Hangar 5B Upgrade
Renovation - 21,000 SF
Post-Bid
$3,178,150 CJ est. value
Kansas City, MO 64116

Airport Terminal - City of Cape Girardeau
New Construction, Infrastructure - 20,000 SF
Pending Verification
$6,000,000 CJ est. value
Cape Girardeau, MO 63701

RFP - Consultant Selection 2023 - Engineering
Term Contract
Bidding
Springfield, MO 65802

RFP - Environmental and Engineering Services to the Overhaul Base at Kansas City International Airport
Term Contract
Post-Bid
Kansas City, MO 64153

Rosecrans Memorial Airport Air Traffic Control Tower - City of St. Joseph
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
Washington Township, MO 64503

Last Updated 07/20/2023 08:09 AM
Project Title

Fiberglass shelter Removal and Install Kansas City

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64153   (Platte County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Federal Aviation Administration (FAA) has a requirement to for Shelter Replacement Kansas City MO. The FAA invites your firm to submit a proposal in accordance with the attached Request for Proposal (RFP) package. Please see attachments for specifics. If you are not able to submit a proposal, please let me know. The contractor is responsible for furnishing all materials, (unless noted otherwise in the contract documents) equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to perform the work described in the attached Statement of Work, Specifications, Drawings, and other attachments posted to this RFP. The Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law. It is anticipated that a firm-fixed-price type construction contract will be awarded as a result of this RFP. Site visit instructions can be found in the RFP, Section L, clause 3.2.2.3-63 Site Visit (Construction). All questions regarding the project/scope of work/drawings must be received in writing to joshua.m.frisch@faa.gov no later than 5:00 p.m. CST on July 21, 2023 to allow for responses to be provided prior to due date for receipt of proposals. Contractors must be registered with the System for Award Management, www.sam.gov on the date established for receipt of offers August 3, 2023. Reference AMS Clause 3.3.1-33 in the QVL SIR 6973GH-20-R-00040, paragraph (d), "if the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." In addition, Offerors must complete and return the attached RFP, narrative, and work plan by closing date. The RFP is attached to this e-mail. The FAA reserves the right to review and verify each Offerors program eligibility. Proposals must be received by Joshua M Frisch no later than 5:00 p.m. CST, August 3, 2023. E-mailed proposals shall be sent to joshua.m.frisch@faa.gov and must contain 6973GH-23-Q-00174 as part of the e-mail subject line. Any responses received after 5:00 p.m. CST, August 3, 2023, may not be considered in accordance with AMS provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of submittal vendor's response may be determined ineligible. As the FAA does not utilize sealed bidding contracting techniques, a public bid opening will not be held. Potential Offerors should note that the FAA reserves the right to communicate with one or more Offerors at any time during the RFP process. This RFP is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals. Inquiries regarding this RFP should be directed to Joshua M Frisch, Contract Specialist, joshua.m.frisch@faa.gov. Thank you in advance for your attention and I look forward to your participation! Again, the Closing date for this RFP is, Thursday, August 3, 2023, at 5:00 PM CST. Proposals are due on August 3, 2023 at 5:00 pm CST. Proposals will not be accepted after this timeframe. This acquisition is Set Aside for Total Small Business. The estimated price range of this procurement is $50,000.00 - $100,000.00. Please see SOW for the ... Please see the Technical Specifications for the shelter replacement and installation at Kansas City, MO Kansas City Airport (MCI); 42 pages. Please see the Construction Drawings for the shelter replacement and installation at Kansas City, MO Kansas City Airport (MCI), 6 pages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents