Similar Projects
Onlogic Production Facility & Office Building
New Construction - 130,790 SF
Conception
South Burlington, VT 05403

Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

New England Chimney Supply Expansion
New Construction
Design
Williston, VT 05495

Burlington Tennis Club
New Construction - 2,500 SF
Design
South Burlington, VT 05403

EAFR Range 6-6 Improvements
Infrastructure
Post-Bid
Jericho, VT

Catch Basin Grate and Pavement Repair
Infrastructure
Post-Bid
South Burlington, VT 05403

Mil Dept - Camp Johnson Paving Improvements
Infrastructure
Results
$500,000 est. value
Colchester, VT

MIL DEPT - AASF Ramp Repair
Infrastructure
Results
South Burlington, VT 05403

Shelburne Green South
New Construction, Renovation - 70,600 SF
Construction
$3,029,100 est. value
Shelburne, VT 05482

Cottonwood Crossing - Phase I
New Construction - 35,670 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Williston, VT 05495

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

Blakely Road Residential
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Colchester, VT 05446

Airport Parkway (Phase 1) - City of South Burlington
Infrastructure
Conception
$563,000 est. value
South Burlington, VT 05403

3070 Williston Road Developement
New Construction - 344,000 SF
Design
South Burlington, VT 05403

Maintenance Garage Yard Repair
Infrastructure
Post-Bid
South Burlington, VT 05403

Last Updated 01/24/2023 08:40 AM
Project Title

Safe Harbor Shelburne Shipyard Expansion

Physical Address View project details and contacts
City, State (County) Shelburne, VT 05482   (Chittenden County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Clubhouse/Social Club, Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of an operations building, a boat storage building and a clubhouse. Scope details have not been released. As of January 24, 2023 the project is on hold. The architect and general contractor have been chosen. The owner will not share information regarding the general contactor. A construction timeline has not been established.* *Absolutely no inquiries will be accepted by the owner.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents