Similar Projects
Lawton Elementary School Addition & Renovation
- 52,000 SF
Conception
$14,600,000 est. value
Oviedo, FL 32765

English Estates Elementary School Remodel
Conception
$9,166,000 est. value
Fern Park, FL 32730

Coral Springs Pre-K - 8 SMART Program
Renovation
Design
$1,875,193 est. value
Coral Springs, FL 33065

Dania ES SMART Program
Design
$1,065,000 est. value
Dania Beach, FL 33004

Construction Management Services for South Lake ES
Addition - 11,000 SF
Bidding
$5,000,000 est. value
Titusville, FL 32796

Hurricane Repairs and Reconstruction - Bay District Schools - Group 4 Schools - Bid Packages 02A , 02B , 07G, 10A
Renovation
Bidding
$441,000 est. value
Lynn Haven, Panama City, Panama City Beach, FL 32413

Deerfield Beach Elementary School - Smart Program Renovations
Post-Bid
$3,777,000 est. value
Deerfield Beach, FL 33441

Technology Upgrades at Myakka River Elementary School
Post-Bid
Port Charlotte, FL 33981

Construction Management (CM) Services
Results
FL

Mildred Helms Elementary School
New Construction, Renovation - 15,630 SF
Results
Less than $5,665,000 est. value
Largo, FL 33770

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Replace Jensen Beach Elementary School
New Construction
Construction
Jensen Beach, FL 34957

New Elementary "D" School
New Construction - 112,658 SF
Pending Verification
Riverview, FL 33578

Oakcrest Elementary School New Music Room & Covered Play Area
New Construction
Pending Verification
$2,711,680 est. value
Ocala, FL 34470

Littlewood Elementary School New Classroom Building
New Construction, Demolition
Conception
$16,827,975 est. value
Gainesville, FL 32605

Last Updated 05/16/2022 08:58 AM
Project Title

Fruitland Park Elementary School Renovations

Physical Address View project details and contacts
City, State (County) Fruitland Park, FL 34731   (Lake County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Master Planning, Bidding Expected July 2022
Bids Due View project details and contacts
Estimated Value $24,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents