Similar Projects
Last Updated | 10/10/2022 11:06 AM |
Project Title | Well Installation and Well Abandonment |
Physical Address | View project details and contacts |
City, State (County) | Moneta, VA 24121 (Bedford County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $30,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Well Installation and Well Abandonment Address: 1051 Family Circle Lane Moneta VA 24121 Cost for Line Item #1 (include total cost for items A-I). These are known factors. Vendors must invoice for actual cost incurred as described herein. The initial bid should be an average cost/foot of depth for 300 feet. 300 feet is an estimate, vendor will bill based on actual service performed. Vendor must bid for 300 ft., any additional footage must be listed as additional services. Vendor who submit bid for over or under 300 feet; will not be accepted. A) Construct a private water well that meets the location, construction specifications, water quantity, and water quality requirements of the Virginia Private Well Regulations(12VAC5-630- 10 et seq., the Regulations). B) Tree Removal and Site Clearing C) Construct the above class III(B) well with a minimum of 50' of casing and grout and in compliance with the Bedford County Health Department Well Construction and Abandonment Permit 109-22-0169 at 1051 Family Circle Lane Moneta VA 24121 in the location shown on the permit. The permit may contain additional conditions, notes, and information needed to construct the well. D) Provide, or subcontract with a licensed plumber and electrician to provide, the well pump, plumbing, and electrical required to convey the water under sanitary conditions from the well to the home plumbing system in the quantity required by the Regulations and the Virginia Uniform Statewide Building Code E) Disinfect the well and plumbing as required by the Regulations and provide the required Uniform Water Well Completion Report (GW2). Obtain a final compliance inspection from the health department and a Record of Inspection and assure that the well is tested and complies with the water quality requirements of the Regulations. F) Disinfect the existing well and assess the well depth, materials, and depth to water. Salvage any materials that can be removed from the well. Abandon the well she is cut off from her neighbor's well. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |