Similar Projects
Jamestown Beach - James City County
New Construction, Alteration
Conception
$1,465,000 est. value
Williamsburg, VA 23185

University Boulevard Relocation - PWSTP43 - City of Harrisonburg
Infrastructure, Alteration
Conception
$8,501,222 est. value
Harrisonburg, VA 22801

North Fairfax Street Mixed-Use Development
New Construction, Infrastructure, Build-out - 240,000 SF
Design
$36,600,000 CJ est. value
Alexandria, VA 22314

White Mill Redevelopment Mixed-Use Development / Danville
New Construction, Infrastructure - 110,000 SF
Design
$62,500,000 CJ est. value
Danville, VA 24541

Bridge Replacement - VA-36
Demolition, New Construction, Infrastructure
Bidding
$1,098,000 CJ est. value
Petersburg, VA 23803

Bridge Replacement - VA-36
Demolition, New Construction, Infrastructure
Bidding
$1,098,000 CJ est. value
Petersburg, VA 23803

Subgrade Stabilization Rt 29 In Albemarle County
Infrastructure
Post-Bid
Charlottesville, Harrisonburg, Staunton, Waynesboro, VA 22980

Subgrade Stabilization Rt 29 In Albemarle County
Infrastructure
Post-Bid
Charlottesville, Harrisonburg, Staunton, Waynesboro, VA 22980

Kings Trail Pump Station 234 Replacement
Results
Less than $1,799,270 est. value
Virginia Beach, VA

Graham Park Sewage Pumping Station and Force Main Replacement
Results
Triangle, VA 22172

FDLLC Fairfax VA WAWA
Renovation, Demolition
Construction
Fairfax, VA 22031

One Logistics Park Winchester Lot 2
New Construction, Infrastructure - 1,024,000 SF
Pending Verification
$110,000,000 CJ est. value
Winchester, VA 22602

Kingspan Manufacturing Facility
Addition, New Construction, Infrastructure - 16,305 SF
Pending Verification
$80,000,000 CJ est. value
Winchester, VA 22603

Welch Lane Drainage Improvements - 19-200 - City of Chesapeake
Infrastructure
Conception
$480,000 CJ est. value
Chesapeake, VA 23320

Dominion Apartments
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Culpeper, VA 22701

Last Updated 10/10/2022 11:06 AM
Project Title

Well Installation and Well Abandonment

Physical Address View project details and contacts
City, State (County) Moneta, VA 24121   (Bedford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Well Installation and Well Abandonment Address: 1051 Family Circle Lane Moneta VA 24121 Cost for Line Item #1 (include total cost for items A-I). These are known factors. Vendors must invoice for actual cost incurred as described herein. The initial bid should be an average cost/foot of depth for 300 feet. 300 feet is an estimate, vendor will bill based on actual service performed. Vendor must bid for 300 ft., any additional footage must be listed as additional services. Vendor who submit bid for over or under 300 feet; will not be accepted. A) Construct a private water well that meets the location, construction specifications, water quantity, and water quality requirements of the Virginia Private Well Regulations(12VAC5-630- 10 et seq., the Regulations). B) Tree Removal and Site Clearing C) Construct the above class III(B) well with a minimum of 50' of casing and grout and in compliance with the Bedford County Health Department Well Construction and Abandonment Permit 109-22-0169 at 1051 Family Circle Lane Moneta VA 24121 in the location shown on the permit. The permit may contain additional conditions, notes, and information needed to construct the well. D) Provide, or subcontract with a licensed plumber and electrician to provide, the well pump, plumbing, and electrical required to convey the water under sanitary conditions from the well to the home plumbing system in the quantity required by the Regulations and the Virginia Uniform Statewide Building Code E) Disinfect the well and plumbing as required by the Regulations and provide the required Uniform Water Well Completion Report (GW2). Obtain a final compliance inspection from the health department and a Record of Inspection and assure that the well is tested and complies with the water quality requirements of the Regulations. F) Disinfect the existing well and assess the well depth, materials, and depth to water. Salvage any materials that can be removed from the well. Abandon the well she is cut off from her neighbor's well.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents